Alta Developers develops high-rise condominiums, boutique residences, rental apartments, residential communities, single-family homes, townhomes, and commercial spaces across South Florida for homebuyers, renters, and investors. Its model combines for-sale development, build-to-rent housing, commercial projects, and asset management services for clients.

Years in business
16
founded In 2010
LinkedIn headcount
23
employees, as shown on LinkedIn · size band 11–50
Units delivered
over 4,000 units
as the company states it
Projects last researched October 14, 2026
Every figure on this card was read out of a document.

Overview

Investor tear sheet

a summary of the tabs that follow · no rating of our own

Company dossier

Legal name
Alta Developers, LLC1
Headquarters
2950 SW 27th Avenue1, Miami1, United States
Founded
In 20101
Entity type
PRIVATE1
Business model
offplan for sale1, build to rent1, commercial1
Markets
1 market listed
What they build
Residential, for sale (5 of 10) · Residential, for rent (5 of 10) · Retail (4 of 10)
Full dossier in About →

Delivery record

6 date-assessed of 10 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
10
within the rolling ten-year window
Median delay
+9.0 mo
the middle of 6 scored projects
Average delay
+18.0 mo
the same projects, pulled by the worst
Average time to deliver
4.1 yrs
start to completion, over 3 delivered projects
Worst slip
+80.0 mo
Neovita Doral · +73.0 to +87.0
2
early or less than 6 months late
6 to 12 months late
3
yellow rows below
Over 12 months late
1
red rows below

Against other developers

6 date-assessed here · 262 developers, 986 date-assessed projects in United States
Median delay
Alta Developers·262 developers in United States
+9.0 mo vs +4.5 mo
this developer 4.5 mo worse
The typical project on each side.
Average delay
Alta Developers·262 developers in United States
+18.0 mo vs +7.3 mo
this developer 10.7 mo worse
Both pulled by their worst few.
On time
Alta Developers·262 developers in United States
33% vs 56%
this developer 23 pts worse
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
Average time to deliver
Alta Developers·262 developers in United States
4.1 yrs vs 2.8 yrs
this developer 1.3 yrs slower
Start to completion, over 3 delivered here and 815 in the market.
Projects and timelines in Track Record →

Resident experience

8 of 10 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
7.9/ 10
Weighted judgment across build and operations · from 8 of 8 rated buildings
Structure & systems
7.1/ 10
Fabric, services, waterproofing, envelope · from 5 of 8 rated buildings
Management & living
7.2/ 10
Upkeep, response times, amenities, community · from 8 of 8 rated buildings

Against other developers

8 rated here · 285 developers, 1453 rated buildings in United States
Overall rating
Alta Developers · 285 other developers in United States
7.9 vs 7.8
this developer 0.1 better
The weighted verdict on each side. From 8 of 8 rated buildings here and 1453 in the market.
Structure & systems
Alta Developers · 285 other developers in United States
7.1 vs 6.9
this developer 0.2 better
Fabric and engineering only — fixed at handover. From 5 of 8 rated buildings here and 625 in the market.
Management & living
Alta Developers · 285 other developers in United States
7.2 vs 7.4
this developer 0.2 worse
Upkeep and response — belongs to whoever runs the building now. From 8 of 8 rated buildings here and 1398 in the market.
The market here is United States: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.
Ratings by building →

Awards & recognition

No documented awards or recognitions in the sources reviewed.

All awards →

Risks & source coverage

  • DELIVERY DELAY May 3, 2022 (reported); temporary certificate of occupancy issued February 6, 2025 Alta Developers took over the stalled, not-yet-started Alana condominium project in Bay Harbor Islands in May 2022 after the prior developer, Ambienta Developers, failed to secure construction financing amid rising costs; Alta relaunched the project, which subsequently received a temporary certificate of occupancy on February 6, 2025, so the delay is historical and was not reported as an Alta-caused default.
  • DELIVERY DELAY 2022-10-05 publication; Alta page retrieved 2026-10-14 (undated current status) New River Central in Fort Lauderdale was reported by The Real Deal as expected to start construction in 2023 and be completed in 2025, but Alta Developers’ current project page lists completion as 2029 (planned), documenting a changed and still-future delivery commitment; the 2022 report described the site as vacant and the predecessor tower as never built.
  • DELIVERY DELAY 2023-08-01 commitment; 2025-02-06 event; 2025-02-10 publication Alana Bay Harbor Islands, developed by Alta Developers after taking over the stalled Ambienta project, missed the reported late-2024 completion expectation and received a temporary certificate of occupancy on February 6, 2025; subsequent evidence shows the project entered closings and occupancy, so this is a resolved delivery delay rather than an active non-delivery.
  • 1 more in Risk & Sources
Record status
active
Company sources
103 source entries across 100 fields
Projects tracked
10 · 10 completed in assessment
All flags and sources →

Track Record

Delivery record

6 date-assessed of 10 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
10
within the rolling ten-year window
Median delay
+9.0 mo
the middle of 6 scored projects
Average delay
+18.0 mo
the same projects, pulled by the worst
Average time to deliver
4.1 yrs
start to completion, over 3 delivered projects
Worst slip
+80.0 mo
Neovita Doral · +73.0 to +87.0
2
early or less than 6 months late
6 to 12 months late
3
yellow rows below
Over 12 months late
1
red rows below

Against other developers

6 date-assessed here · 262 developers, 986 date-assessed projects in United States
Median delay
Alta Developers·262 developers in United States
+9.0 mo vs +4.5 mo
this developer 4.5 mo worse
The typical project on each side.
Average delay
Alta Developers·262 developers in United States
+18.0 mo vs +7.3 mo
this developer 10.7 mo worse
Both pulled by their worst few.
On time
Alta Developers·262 developers in United States
33% vs 56%
this developer 23 pts worse
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
Average time to deliver
Alta Developers·262 developers in United States
4.1 yrs vs 2.8 yrs
this developer 1.3 yrs slower
Start to completion, over 3 delivered here and 815 in the market.
The market here is United States: every other developer whose head office is in the same country, because planning regimes and reporting norms move together within one. It is not a city, a sector or a size band. Read the two delay figures together. A median close to the market with a much better average means no single disaster; the reverse means one project is carrying the record. Time to deliver runs from the earliest start we hold to the completion itself — a construction start where a source gave one, otherwise a sales launch, otherwise the launch year read as its January. A handover the sources place only inside a year is read as that December, so a duration is the widest the record allows rather than the flattering end of it. Only delivered projects dated at both ends count, so it is taken over fewer projects than the delay figures, and a long build is not a fault: a tower is not a villa run. Sourced figures only, both sides, and values taken from documents held on file are excluded here — a developer who shares their records should not score better than one who does not.

Construction start to handover

10 of 10 projects dated · 5 places
Based on covered projects with documented construction or launch dates and available handover dates. Timelines vary by project and may not represent the developer’s full portfolio.
Construction start, or the launchTarget completion (window)Completion or handover, as reportedCurrently statedLaunch year only, no date publishedEarly or ≤6 mo lateOver 6–12 mo lateOver 12 mo lateStalled
Miami, United States
Bay Harbor Islands, United States
Doral, United States
Fort Lauderdale, United States
Boynton Beach, United States
20142015201620172018201920202021202220232024202520262027todayMIAMI, UNITED STATES+11.5 moestimated+4.5 moverified+12 moverified+10.5 moverifiedBAY HARBOR ISLANDS, UNITED STATES+7.5 moverifiedDORAL, UNITED STATES+80 moverifiedcompleted, no target publishedFORT LAUDERDALE, UNITED STATEScompleted, no target publishedcompleted, no target publishedBOYNTON BEACH, UNITED STATES−6.5 moverified
Click a row in the chart to open a project, or a table row below to see its sources. The chart runs wider than the page where the record spans many years — scroll it sideways to follow a project to its handover. Every date we have is drawn. A hollow marker is only a launch year, not a date anyone published. No dates published means we looked and found none; dates not yet checked means we have not looked yet. Handing over is not finished — rows say which. A delay is shown when one source gives the promised date and another gives the real one, however rough: "2019" still counts, and the row shows how wide that is. Projects missing one of the two dates, or with sources that disagree, are left out of the figures. 1 dated statement is held back: a broker listing with no date on it, or a page with no year, cannot fix a date. 2 turned out to be about something else — a phase, a neighbour, the wider masterplan — and are marked off-subject.

Building & Livability Ratings

Resident experience

8 of 10 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
7.9/ 10
Weighted judgment across build and operations · from 8 of 8 rated buildings
Structure & systems
7.1/ 10
Fabric, services, waterproofing, envelope · from 5 of 8 rated buildings
Management & living
7.2/ 10
Upkeep, response times, amenities, community · from 8 of 8 rated buildings

Against other developers

8 rated here · 285 developers, 1453 rated buildings in United States
Overall rating
Alta Developers · 285 other developers in United States
7.9 vs 7.8
this developer 0.1 better
The weighted verdict on each side. From 8 of 8 rated buildings here and 1453 in the market.
Structure & systems
Alta Developers · 285 other developers in United States
7.1 vs 6.9
this developer 0.2 better
Fabric and engineering only — fixed at handover. From 5 of 8 rated buildings here and 625 in the market.
Management & living
Alta Developers · 285 other developers in United States
7.2 vs 7.4
this developer 0.2 worse
Upkeep and response — belongs to whoever runs the building now. From 8 of 8 rated buildings here and 1398 in the market.
The market here is United States: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.

By building

8 rated · 2 not rated · scale 1–10
ProjectOverallStructure & systemsManagement & living
Alana Bay Harbor IslandsBay Harbor Islands30 units
8.5/ 10
—/ 10
7.5/ 10

Birdeye provides the largest published review base at 8 reviews and reports 4.9/5, which converts to approximately 9.5/10 on the stated curve. Because the anchor has fewer than 10 reviews, the final score is constrained to within one point of 6.5; the available written feedback is positive but too sparse to justify a further adjustment.

+ Modern luxury+ Calm community atmosphere+ Positive initial visitor impression

no notes returned

no links returned

The substantive review describes Alana as a “stunning hidden gem” and says it “perfectly balances modern luxury with the calm, community-driven atmosphere” of Bay Harbor Islands. The available review text does not provide resident-level evidence about management speed, security, maintenance response, or common-area upkeep.

Pacifica Boynton BeachBoynton Beach324 units
8.5/ 10
7.4/ 10
8.1/ 10

Apartments.com’s 4.6/5 blended building rating from 110 renter reviews is the largest directly published scored aggregate located and converts to 8.8 under the supplied curve. Repeated severe elevator and gate complaints, plus moderate responsiveness and upkeep complaints, outweigh but do not erase recurring praise for amenities, staff, cleanliness and location, producing an overall resident score of 8.1.

+ Modern apartments+ New appliances reported+ Buildings generally maintained well+ Prompt repair reported by some residents
− Repeated elevator outages− Elevator down for months in some reports− Faulty refrigerator/freezer reported− Loud furnace and washing machine
+ Strong pool and gym feedback+ Helpful leasing staff+ Friendly community+ Quiet atmosphere+ Convenient location
− Unresponsive office follow-up− Broken security gate− Pet-waste and stairwell cleanliness− Parking difficulty− Key-fob access problems

Structural and systems feedback is mixed. Residents reported that buildings and living areas are generally maintained well and that some maintenance requests were completed quickly, but multiple reviews describe elevators being out for a month or longer; one states, “Elevators out of service for months,” and another reports unresolved refrigerator/freezer problems.

Daily life reviews praise the “pool and gym,” friendly staff, quiet atmosphere and walkable shopping, with several residents describing a clean and welcoming community. Operational complaints are substantial, however: residents report that the office sometimes does not answer, the gate and key fobs were broken, pet waste remained for weeks, and parking could require “20-30 minutes” of searching.

Quadro Miami Design DistrictMiami Design District, Miami198 units
8.4/ 10
—/ 10
8.1/ 10
Booking.com 8.4/10, 8.9/10, 9.1/10, 9.1/10, 8.4/10, 9/10, 9.2/10 · 718 reviews · booking.com
Airbnb 4.8/5, 4.8/5, 4.8/5, 4.8/5, 4.8/5 · 210 reviews · airbnb.com
Combined from 12 published figures on 2 platforms, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 8.1.

Booking.com's 8.7/10 from 718 verified guest reviews is the largest published review base and sets the converted level at 7.4/10 under the supplied guest curve. The much higher Airbnb result is a meaningful dissent but has a smaller base; old resident complaints about management and building defects temper confidence without establishing a current severe failure.

+ Well-maintained property reported+ Strong AC+ Modern finishes
− One resident alleged defective fixtures− One resident alleged non-working outlets− One resident alleged bugs in trash/package rooms
+ Convenient Design District location+ Clean apartments+ Secure controlled access+ Good parking+ Positive pool and amenity feedback
− Management responsiveness concerns− Concierge service complaint− Outside traffic noise− Transient short-stay environment− Pool heating concern

Most guest feedback describes the apartments as “modern, spotless clean” and says the property is “secure and well maintained”; one guest specifically praised “Strong AC.” A December 2020 resident review alleged “fixtures falling from the walls,” “outlets that don't work,” and trash/package rooms “filled with bugs,” but this is an old single report rather than evidence of a current building-wide condition.

Guests consistently praise the location, cleanliness and access: one called it “a very secure and well maintained property,” while another said the apartment was “very clean” and the host was “very responsive.” Counterevidence is concentrated in the resident material: a 2020 reviewer described management as confrontational and package handling as inconvenient, and recent guest feedback notes outside highway/rail noise; these findings should be treated cautiously because the resident complaints are old and the building has substantial short-stay use.

EON Squared North TowersFlagler Village, Fort Lauderdale270 units
7.8/ 10
7.9/ 10
RentCafe 5/5 · 3 reviews · rentcafe.com
RentCafe publishes 5/5 from 3 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 7.9.
6.6/ 10
RentCafe 3.5/5, 5/5, 3.5/5, 4/5, 3.5/5 · 3 reviews · rentcafe.com
Combined from 5 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 6.6.

Google’s 4.4/5 rating from 373 reviews is the largest published review base and converts to 8.2/10 under the requested curve. The score is moved down by repeated elevator, access/security, maintenance, noise and upkeep complaints, partly offset by repeated praise for staff, amenities, community and location; the other large-platform aggregates do not differ materially after conversion.

+ Modern building and finishes+ Clean, well-kept apartments+ Attentive building maintenance reported by some residents+ North building elevators reported functioning+ Good amenities and common-space design
− Recurring elevator outages− Thin walls and audible plumbing/appliances− Unfinished construction reported in early occupancy− Key-fob and access problems− Garage security concerns
+ Helpful and professional staff+ Responsive leasing agents+ Strong amenity package+ Community events and welcoming atmosphere+ Walkable location
− Management responsiveness concerns− Garage and package-security complaints− Amenities reported broken or unavailable− Dirty garage and outdoor areas− Pet waste and grounds upkeep complaints

Residents describe the building as modern, clean and well designed, with one reviewer calling the finishes and common spaces “really nice.” The physical-condition feedback is nevertheless uneven: reviewers report “2 of 4 elevators down,” “extremely thin walls,” audible toilets and appliances, and early construction defects including stained carpets and incomplete security/access work.

Daily-life reviews repeatedly praise the staff—“Very kind and polite staff”—as well as amenities, events and the walkable location. The negative experience is concentrated in operations: one 2025 review says quality of life “dropped significantly,” citing broken garage doors, unavailable elevators and amenities, dirty areas, and requests marked complete without repairs; older reviews also report package theft and weak access control.

Wynwood BayMiami156 units
7.8/ 10
—/ 10
7.2/ 10
RentCafe 4/5, 4.5/5, 4.5/5, 4.5/5, 4/5, 4.5/5, 3.5/5 · 23 reviews · rentcafe.com
Combined from 7 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.2.

Postcard provides the largest reported review base, 4.3/5 from 280 reviews, which converts to 7.9 before commentary. The mixed written evidence supports a small net downward adjustment because recurring maintenance and management complaints slightly outweigh the recurring praise adjustment; no structural score is assigned because no published structural aggregate was found.

− Poor-quality appliances− Faulty AC/heater reported− Leaky showerhead unresolved
+ Attentive staff+ Responsive management+ Fast maintenance+ Strong gym and pool amenities+ Clean community
− Maintenance communication problems− Management responsiveness complaints− Construction noise and bright lights− Value concerns− Reported appliance problems

Published resident feedback includes a faulty AC/heater that was allegedly addressed by leaving the fan and AC running continuously, and a leaky showerhead that maintenance declined to fix. Another review says appliances are “of poor quality and constantly need to be fixed/replaced”; these are isolated written reports rather than a published structural rating.

Residents frequently praise the staff and amenities: one calls the manager “THE ABSOLUTE BEST,” while another says the team is “fast and on top of everything” and the community is kept “quite clean.” The negative reviews describe management as rude or unresponsive, maintenance communication problems, and construction that was “loud all day” with bright lights at night.

Crest at Pinecrest Phase IMiami296 units
7.5/ 10
7.2/ 10
ApartmentRatings 4.5/5 · no review count · apartmentratings.com
ApartmentRatings publishes 4.5/5 with no review count. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 7.2.
7.3/ 10
ApartmentRatings 4.7/5, 4.3/5, 4.9/5, 4.6/5 · no review count · apartmentratings.com
Combined from 4 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.3.

ApartmentRatings provides the largest clearly identified resident review base among the resident portals used for the score, at 4.1/5 from 38 reviews, which converts to 7.4/10 before commentary. The score is pulled down by repeated management, repair and access complaints, including severe reports of elevator/garage failures and an unresolved leak with mold; recurring praise for staff, amenities, cleanliness and location partly offsets those deductions.

+ Modern building+ Well-maintained building reported+ Responsive maintenance reported+ Excellent maintenance survey rating+ Modern amenities and finishes
− Recurring elevator failures− Garage-gate failures− Delayed common-area repairs− Unresolved water leak and ceiling mold− Trash-chute defect
+ Helpful staff and concierge+ Strong amenity offering+ Clean and organized areas+ Convenient location+ Friendly community
− Slow or unclear management communication− Guest-parking shortages− Traffic noise− Inconsistent community engagement− Pet and smoking rule issues

Residents describe the building as “beautiful, modern, and well-maintained,” and ApartmentRatings publishes a 4.5/5 maintenance score. The physical-condition evidence is nevertheless mixed: reviewers report monthly elevator failures, a broken garage-access elevator, a trash-chute cover that would not close, and one unresolved leak that left a ceiling “molding.”

The strongest day-to-day positives are the amenities, location and staff: one resident called the concierge team “real gems,” while another said staff were “friendly, professional, and helpful.” The negative experience is concentrated in operations—reviewers describe delayed responses, limited guest parking and rule-enforcement problems, including one resident who said the front office gave “never a straight answer and always a runaround.”

EON Squared South TowersFlagler Village, Fort Lauderdale206 units
7.4/ 10
5.6/ 10
ApartmentRatings 2/5 · 1 review · apartmentratings.com
ApartmentRatings publishes 2/5 from 1 review. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 5.6.
5.5/ 10
ApartmentRatings 1/5, 1/5, 2/5, 2/5, 2/5 · 1 review · apartmentratings.com
Combined from 5 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 5.5.

Google’s 4.4/5 from 411 reviews sets the level and converts to 8.2/10. Repeated South-tower elevator failures and recurring management, security and noise complaints pull the result down, while positive staff, amenity and location themes provide partial offset. Structure is lower than the overall score because the reported systems evidence is concentrated on elevator reliability rather than broad engineering performance.

+ Modern building+ Clean and well-kept apartments+ Updated finishes
− South-tower elevator outages− Prolonged lift repairs− Thin walls− Garage access-security issues− Pool and construction-condition complaints in older reviews
+ Friendly leasing staff+ Responsive individual staff members+ Strong amenities+ Central walkable location+ Clean common areas reported by some reviewers
− Delayed repair communication− Elevator disruption− Security concerns− Noise and thin walls− Inconsistent South-versus-North experience

The clearest systems complaint is South-tower elevator service: one resident reported “2 of 4 elevators down,” while another reported “9+ months” with one elevator and periods without any elevator access. Older reviews also mention thin walls, incomplete construction and unsecured garage access; these establish historical complaints, not necessarily conditions still current on October 14, 2026.

Daily-life feedback is polarized: reviewers praise staff as “exceptionally friendly” and describe the amenities and location positively, but South-tower residents report elevators down for extended periods and inadequate repair updates. Other reviews cite an unlocked apartment door, package or garage-security concerns and noise, suggesting a materially uneven experience by tower and issue type.

Neovita DoralDoral142 units
7.4/ 10
7.3/ 10
7.4/ 10

The Google Reviews/Maps aggregate of 4.1/5 from 59 reviews sets the level; using the stated market curve, it converts to approximately 7.3/10. The readable reviews add modest net support for cleanliness, quietness and construction quality, offset by repeated visitor-parking criticism and one serious towing allegation, producing 7.4/10 overall.

+ Reported well-constructed homes+ Modern design+ Clean appearance
+ Clean common environment+ Quiet suburban setting+ Modern appearance+ Attractive homes
− Visitor-parking complaints− Towing/management complaint

One resident review describes the homes as “very well-constructed,” while another calls the community “really modern and quiet.” No reviewed source located for this report published recurring complaints about plumbing, HVAC, electrical systems, leaks, waterproofing, lifts or other building-system failures.

Reviews describe the place as “super clean,” “nice and clean,” and “really modern and quiet,” with one calling it a nice place to live. The main operational criticism was an “expensive, complicated process for visitors' parking”; a separate reviewer alleged that management authorized towing legally parked visitor vehicles during Hurricane Milton and wrote, “DO NOT LIVE HERE!”

Only buildings that have reached handover are rated. 2 of 10 projects carry no rating: a building still under construction is never asked about, one that has just been handed over may not have been reached yet, and the rest were asked about and no published resident commentary was found. Structure is fixed at handover and stays the developer's; management and living belongs to whoever runs the building now. The overall verdict weights both rather than averaging them. None of this is checked: a rating is what people published about a building, aggregated — it is not evidence, it cannot move a delay figure, and it is not part of the delivery record above.

About

Company dossier

Legal name
Alta Developers, LLC
Headquarters
2950 SW 27th Avenue, Miami, United States
33133
Founded
In 2010
Miami, United States
Entity type
PRIVATE
Revenue
not published
Business model
offplan for sale, build to rent, commercial

Partners

5 partners
Related Group
joint venture

Related Group and Alta Developers are partners in Casa Bella Residences by B&B Italia, a downtown Miami residential tower.

Cain International
funder

Cain International provided the construction financing for Casa Bella Residences by B&B Italia.

Jaxi Builders
contractor

Jaxi Builders is the general contractor for Cassia in Coral Gables.

Baptist Health South Florida
landowner

Alta acquired the Cassia development property from Baptist Health South Florida in 2020.

Amerant Bank
funder

Amerant Bank provided a loan for the Cassia development in early 2024.

Sources: name

PRESS2023-11-17

Related Group and Alta Developers Close on $240 Million in Financing from Cain International for Casa Bella Residences by B&B Italia in Miami — Cain

Cain International · carried by cainint.com
Leading real estate developer Related Group (Related) and partner Alta Developers today announced the closing of $240 million in financing for the highly-anticipated residential tower, Casa Bella Residences by B&B Italia (Casa Bella), which broke ground earlier this month in Downtown Miami’s burgeoning Arts and Cultural District.
value seen: Related Group
https://cainint.com/news-and-insights/related-group-and-alta-developers-close-on-240-million-in-financing-from-cain-international-for-casa-bella-residences-by-bb-italia-in-miami/

Sources: partner type

PRESS2023-11-17

Related Group and Alta Developers Close on $240 Million in Financing from Cain International for Casa Bella Residences by B&B Italia in Miami — Cain

Cain International · carried by cainint.com
Leading real estate developer Related Group (Related) and partner Alta Developers today announced the closing of $240 million in financing for the highly-anticipated residential tower, Casa Bella Residences by B&B Italia (Casa Bella), which broke ground earlier this month in Downtown Miami’s burgeoning Arts and Cultural District.
value seen: partner Alta Developers
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://cainint.com/news-and-insights/related-group-and-alta-developers-close-on-240-million-in-financing-from-cain-international-for-casa-bella-residences-by-bb-italia-in-miami/

Sources: summary

PRESS2023-11-17

Related Group and Alta Developers Close on $240 Million in Financing from Cain International for Casa Bella Residences by B&B Italia in Miami — Cain

Cain International · carried by cainint.com
Leading real estate developer Related Group (Related) and partner Alta Developers today announced the closing of $240 million in financing for the highly-anticipated residential tower, Casa Bella Residences by B&B Italia (Casa Bella), which broke ground earlier this month in Downtown Miami’s burgeoning Arts and Cultural District.
value seen: Casa Bella Residences by B&B Italia
value paraphrased from this source
https://cainint.com/news-and-insights/related-group-and-alta-developers-close-on-240-million-in-financing-from-cain-international-for-casa-bella-residences-by-bb-italia-in-miami/

Sources: name

PRESS2023-11-17

Related Group and Alta Developers Close on $240 Million in Financing from Cain International for Casa Bella Residences by B&B Italia in Miami — Cain

Cain International · carried by cainint.com
The loan was provided by Cain International (Cain) — a privately held investment firm with over $16 billion in assets under management.
value seen: Cain International
https://cainint.com/news-and-insights/related-group-and-alta-developers-close-on-240-million-in-financing-from-cain-international-for-casa-bella-residences-by-bb-italia-in-miami/

Sources: partner type

PRESS2023-11-17

Related Group and Alta Developers Close on $240 Million in Financing from Cain International for Casa Bella Residences by B&B Italia in Miami — Cain

Cain International · carried by cainint.com
The loan was provided by Cain International (Cain) — a privately held investment firm with over $16 billion in assets under management.
value seen: loan was provided
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://cainint.com/news-and-insights/related-group-and-alta-developers-close-on-240-million-in-financing-from-cain-international-for-casa-bella-residences-by-bb-italia-in-miami/

Sources: summary

PRESS2023-11-17

Related Group and Alta Developers Close on $240 Million in Financing from Cain International for Casa Bella Residences by B&B Italia in Miami — Cain

Cain International · carried by cainint.com
Related Group and Alta Developers today announced the closing of $240 million in financing for the highly-anticipated residential tower, Casa Bella Residences by B&B Italia (Casa Bella).
value seen: $240 million in financing
value paraphrased from this source
https://cainint.com/news-and-insights/related-group-and-alta-developers-close-on-240-million-in-financing-from-cain-international-for-casa-bella-residences-by-bb-italia-in-miami/

Sources: name

COMPANY2025-02-28

Condo with short-term rentals breaks ground in Coral Gables | Alta Developers

Alta Developers
Doral-based Jaxi Builders is the general contractor and should complete construction in February 2027.
value seen: Jaxi Builders
https://www.altadevelopers.com/press/condo-with-short-term-rentals-breaks-ground-in-coral-gables

Sources: partner type

COMPANY2025-02-28

Condo with short-term rentals breaks ground in Coral Gables | Alta Developers

Alta Developers
Doral-based Jaxi Builders is the general contractor and should complete construction in February 2027.
value seen: general contractor
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://www.altadevelopers.com/press/condo-with-short-term-rentals-breaks-ground-in-coral-gables

Sources: summary

COMPANY2025-02-28

Condo with short-term rentals breaks ground in Coral Gables | Alta Developers

Alta Developers
Doral-based Jaxi Builders is the general contractor and should complete construction in February 2027.
value seen: Cassia
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.altadevelopers.com/press/condo-with-short-term-rentals-breaks-ground-in-coral-gables

Sources: name

COMPANY2025-02-28

Condo with short-term rentals breaks ground in Coral Gables | Alta Developers

Alta Developers
The developer acquired the property from Baptist Health South Florida for $17.45million in 2020.
value seen: Baptist Health South Florida
https://www.altadevelopers.com/press/condo-with-short-term-rentals-breaks-ground-in-coral-gables

Sources: partner type

COMPANY2025-02-28

Condo with short-term rentals breaks ground in Coral Gables | Alta Developers

Alta Developers
The developer acquired the property from Baptist Health South Florida for $17.45million in 2020.
value seen: acquired the property from
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://www.altadevelopers.com/press/condo-with-short-term-rentals-breaks-ground-in-coral-gables

Sources: summary

COMPANY2025-02-28

Condo with short-term rentals breaks ground in Coral Gables | Alta Developers

Alta Developers
The developer acquired the property from Baptist Health South Florida for $17.45million in 2020.
value seen: property
value paraphrased from this source
https://www.altadevelopers.com/press/condo-with-short-term-rentals-breaks-ground-in-coral-gables

Sources: name

COMPANY2025-02-28

Condo with short-term rentals breaks ground in Coral Gables | Alta Developers

Alta Developers
The developer obtained a $6.76 million loan from Amerant Bank in early 2024, but it doesn’t appear to have a construction loan at this time.
value seen: Amerant Bank
https://www.altadevelopers.com/press/condo-with-short-term-rentals-breaks-ground-in-coral-gables

Sources: partner type

COMPANY2025-02-28

Condo with short-term rentals breaks ground in Coral Gables | Alta Developers

Alta Developers
The developer obtained a $6.76 million loan from Amerant Bank in early 2024, but it doesn’t appear to have a construction loan at this time.
value seen: loan from Amerant Bank
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://www.altadevelopers.com/press/condo-with-short-term-rentals-breaks-ground-in-coral-gables

Sources: summary

COMPANY2025-02-28

Condo with short-term rentals breaks ground in Coral Gables | Alta Developers

Alta Developers
The developer obtained a $6.76 million loan from Amerant Bank in early 2024, but it doesn’t appear to have a construction loan at this time.
value seen: $6.76 million loan
value paraphrased from this source
https://www.altadevelopers.com/press/condo-with-short-term-rentals-breaks-ground-in-coral-gables

Registrations & licences

none found
Jurisdiction-agnostic: a DLD number, a Companies House number and a state RERA registration all land in the same table.

Contact

Markets

1 countries
United Statesactive 10 projects tracked

What they build

3 types
Residential, for sale5 of 10
Residential, for rent5 of 10
Retail4 of 10
A project counts once under each type it carries, so the shares add to more than the project count.

Management

Principals & executives

6 names found
RO
Raimundo Onetto
Raimundo Onetto is Alta’s principal and CEO. He is an architect who founded Archiplan, helped establish Archiplan USA with Terra Group, and has delivered more than 3,500 South Florida units.
Current title
Principal & CEO
Experience
35+ years real estate
Companies before
ArchiplanArchiplan USA / Terra Group
Education
not published
Other boards
none sourced
Known for
FounderArchitect3,500+ units
https://linkedin.com/in/raimundo-onetto-b92585b6
since In 2010 he founded Alta Developers.

Sources: full name

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
Principal & CEO Onetto has 35 years of development experience, bringing over 3,500 units to the South Florida market. An architect by trade, he began his career as the Founder & Partner of the Chilean architecture firm Archiplan. In 2002, he brought his family to Miami and partnered with Terra Group to introduce Archiplan USA. In 2010 he founded Alta Developers.
value seen: Raimundo Onetto
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: linkedin page

SOCIALdate not shown in source

LinkedIn profile

LinkedIn
Alta Developers profile identifies this person at Alta Developers
value seen: https://linkedin.com/in/raimundo-onetto-b92585b6
https://linkedin.com/in/raimundo-onetto-b92585b6

Sources: previous companies

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
Principal & CEO Onetto has 35 years of development experience, bringing over 3,500 units to the South Florida market. An architect by trade, he began his career as the Founder & Partner of the Chilean architecture firm Archiplan. In 2002, he brought his family to Miami and partnered with Terra Group to introduce Archiplan USA. In 2010 he founded Alta Developers.
value seen: Archiplan; Archiplan USA / Terra Group
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: role type

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
Principal & CEO Onetto has 35 years of development experience, bringing over 3,500 units to the South Florida market. An architect by trade, he began his career as the Founder & Partner of the Chilean architecture firm Archiplan. In 2002, he brought his family to Miami and partnered with Terra Group to introduce Archiplan USA. In 2010 he founded Alta Developers.
value seen: CEO
value paraphrased from this source
https://www.altadevelopers.com/about

Sources: since

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
Principal & CEO Onetto has 35 years of development experience, bringing over 3,500 units to the South Florida market. An architect by trade, he began his career as the Founder & Partner of the Chilean architecture firm Archiplan. In 2002, he brought his family to Miami and partnered with Terra Group to introduce Archiplan USA. In 2010 he founded Alta Developers.
value seen: In 2010 he founded Alta Developers.
https://www.altadevelopers.com/about

Sources: summary

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
Principal & CEO Onetto has 35 years of development experience, bringing over 3,500 units to the South Florida market. An architect by trade, he began his career as the Founder & Partner of the Chilean architecture firm Archiplan. In 2002, he brought his family to Miami and partnered with Terra Group to introduce Archiplan USA. In 2010 he founded Alta Developers.
value seen: Raimundo Onetto is Alta’s principal and CEO. He is an architect who founded Archiplan, helped establish Archiplan USA with Terra Group, and has delivered more than 3,500 South Florida units.
https://www.altadevelopers.com/about

Sources: tags

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
Principal & CEO Onetto has 35 years of development experience, bringing over 3,500 units to the South Florida market. An architect by trade, he began his career as the Founder & Partner of the Chilean architecture firm Archiplan. In 2002, he brought his family to Miami and partnered with Terra Group to introduce Archiplan USA. In 2010 he founded Alta Developers.
value seen: Founder; 35 years real estate; Architect; 3,500+ units
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: title

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
Principal & CEO Onetto has 35 years of development experience, bringing over 3,500 units to the South Florida market. An architect by trade, he began his career as the Founder & Partner of the Chilean architecture firm Archiplan. In 2002, he brought his family to Miami and partnered with Terra Group to introduce Archiplan USA. In 2010 he founded Alta Developers.
value seen: Principal & CEO
https://www.altadevelopers.com/about
IM
Ignacio Montes
Ignacio Montes is President and the company’s Florida filing identifies him as COO. His background is in finance, investment banking and asset management, including partner roles at Link Capital Partners and Credicorp Capital.
Current title
President
since 2020
Experience
no career length stated
Companies before
Link Capital PartnersCredicorp CapitalJ.P. Morgan
Education
Universidad Católica de ChileBusiness and Economics
Kellogg School of Management, Northwestern UniversityMBA
Other boards
SimplePark — Board Member and FounderNomada Residences — Board Member
Known for
PresidentCOOMBAFinance & investment banking
https://linkedin.com/in/ignacio-montes-43221614

Sources: education

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
President Mr. Montes holds a Business and Economics degree from Universidad Católica de Chile and an MBA from Kellogg School of Management, Northwestern University. Prior to joining Alta Developers in 2020, Ignacio had over 15 years of finance and investment banking and asset management experience as partner at Credicorp Capital and Link Capital Partners.
value seen: Universidad Católica de Chile — Business and Economics; Kellogg School of Management, Northwestern University — MBA
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: full name

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
President Mr. Montes holds a Business and Economics degree from Universidad Católica de Chile and an MBA from Kellogg School of Management, Northwestern University. Prior to joining Alta Developers in 2020, Ignacio had over 15 years of finance and investment banking and asset management experience as partner at Credicorp Capital and Link Capital Partners.
value seen: Ignacio Montes
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: linkedin page

SOCIALdate not shown in source

LinkedIn profile

LinkedIn
Alta Developers profile identifies this person at Alta Developers
value seen: https://linkedin.com/in/ignacio-montes-43221614
https://linkedin.com/in/ignacio-montes-43221614

Sources: other boards

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
President Mr. Montes holds a Business and Economics degree from Universidad Católica de Chile and an MBA from Kellogg School of Management, Northwestern University. Prior to joining Alta Developers in 2020, Ignacio had over 15 years of finance and investment banking and asset management experience as partner at Credicorp Capital and Link Capital Partners.
value seen: SimplePark — Board Member and Founder; Nomada Residences — Board Member
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: previous companies

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
President Mr. Montes holds a Business and Economics degree from Universidad Católica de Chile and an MBA from Kellogg School of Management, Northwestern University. Prior to joining Alta Developers in 2020, Ignacio had over 15 years of finance and investment banking and asset management experience as partner at Credicorp Capital and Link Capital Partners.
value seen: Link Capital Partners; Credicorp Capital; J.P. Morgan
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: role type

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
President Mr. Montes holds a Business and Economics degree from Universidad Católica de Chile and an MBA from Kellogg School of Management, Northwestern University. Prior to joining Alta Developers in 2020, Ignacio had over 15 years of finance and investment banking and asset management experience as partner at Credicorp Capital and Link Capital Partners.
value seen: CEO
value paraphrased from this source
https://www.altadevelopers.com/about

Sources: since

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
President Mr. Montes holds a Business and Economics degree from Universidad Católica de Chile and an MBA from Kellogg School of Management, Northwestern University. Prior to joining Alta Developers in 2020, Ignacio had over 15 years of finance and investment banking and asset management experience as partner at Credicorp Capital and Link Capital Partners.
value seen: 2020
https://www.altadevelopers.com/about

Sources: summary

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
President Mr. Montes holds a Business and Economics degree from Universidad Católica de Chile and an MBA from Kellogg School of Management, Northwestern University. Prior to joining Alta Developers in 2020, Ignacio had over 15 years of finance and investment banking and asset management experience as partner at Credicorp Capital and Link Capital Partners.
value seen: Ignacio Montes is President and the company’s Florida filing identifies him as COO. His background is in finance, investment banking and asset management, including partner roles at Link Capital Partners and Credicorp Capital.
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: tags

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
President Mr. Montes holds a Business and Economics degree from Universidad Católica de Chile and an MBA from Kellogg School of Management, Northwestern University. Prior to joining Alta Developers in 2020, Ignacio had over 15 years of finance and investment banking and asset management experience as partner at Credicorp Capital and Link Capital Partners.
value seen: President; COO; MBA; Finance & investment banking
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: title

REGULATORdate not shown in source

ALTA DEVELOPERS, LLC. MIAMI, FL

Florida Department of State records as reproduced by BisProfiles
The ALTA DEVELOPERS, LLC managed by the two persons from MIAMI on following positions: Chief Executive Officer, COO ... Juan Ignacio Montes Labarca ... Position COO
value seen: COO
https://bisprofiles.com/fl/alta-developers-l12000121023
COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
President Mr. Montes holds a Business and Economics degree from Universidad Católica de Chile and an MBA from Kellogg School of Management, Northwestern University. Prior to joining Alta Developers in 2020, Ignacio had over 15 years of finance and investment banking and asset management experience as partner at Credicorp Capital and Link Capital Partners.
value seen: President
https://www.altadevelopers.com/about
TA
Tal Alon
Tal Alon runs Nomada Residences, an Alta team business. Independent speaker information describes him as a Miami hospitality operator with more than a decade of experience and a prior COO role at Royal Stays Miami.
Current title
CEO, Nomada Residences
Experience
no career length stated
Companies before
Royal Stays Miami
Education
Touro University
Other boards
none sourced
Known for
Subsidiary CEOMiami hospitalityex-Royal Stays

Sources: education

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Tal Alon CEO, Nomada Residences
value seen: Touro University
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: full name

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Tal Alon CEO, Nomada Residences
value seen: Tal Alon
https://www.altadevelopers.com/about

Sources: previous companies

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Tal Alon CEO, Nomada Residences
value seen: Royal Stays Miami
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: role type

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Tal Alon CEO, Nomada Residences
value seen: COUNTRY_CEO
value paraphrased from this source
https://www.altadevelopers.com/about

Sources: summary

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Tal Alon CEO, Nomada Residences
value seen: Tal Alon runs Nomada Residences, an Alta team business. Independent speaker information describes him as a Miami hospitality operator with more than a decade of experience and a prior COO role at Royal Stays Miami.
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about
PRESSdate not shown in source

Tal Alon - Nomada Residences | Short Term Rental Winter Speaker

Informa Connect
Tal has spent more than a decade building and running hospitality operations in Miami. Before Nomada, he served nearly ten years as COO of Royal Stays Miami
value seen: more than a decade building and running hospitality operations in Miami; COO of Royal Stays Miami
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://informaconnect.com/imn-str-winter/speakers/tal-alon/

Sources: tags

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Tal Alon CEO, Nomada Residences
value seen: Subsidiary CEO; Miami hospitality; ex-Royal Stays
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: title

PRESSdate not shown in source

Tal Alon - Nomada Residences | Short Term Rental Winter Speaker

Informa Connect
Chief Executive Officer at Nomada Residences
value seen: Chief Executive Officer at Nomada Residences
https://informaconnect.com/imn-str-winter/speakers/tal-alon/
COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Tal Alon CEO, Nomada Residences
value seen: CEO, Nomada Residences
https://www.altadevelopers.com/about
MJ
Marcela Jimenez
Marcela Jimenez is Alta’s finance leader, shown by the company as CFO and by her professional profile as VP of Finance and Accounting. Her profile lists business, human-resources and finance education, including a cum-laude master’s degree.
Current title
Chief Financial Officer
since Jan 2015
Experience
11+ years at alta
Companies before
none sourced
Education
Florida International UniversityMaster in Business Administrative, Concentration: Finance
Florida International UniversityBachelor of Human Resource Management
Other boards
none sourced
Known for
CFOMBA FinanceCum Laude
https://linkedin.com/in/marcela-jimenez-43b86542

Sources: education

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Marcela Jimenez Chief Financial Officer
value seen: Florida International University — Master in Business Administrative, Concentration: Finance; Florida International University — Bachelor of Human Resource Management
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: full name

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Marcela Jimenez Chief Financial Officer
value seen: Marcela Jimenez
https://www.altadevelopers.com/about

Sources: linkedin page

SOCIALdate not shown in source

LinkedIn profile

LinkedIn
Alta Developers profile identifies this person at Alta Developers
value seen: https://linkedin.com/in/marcela-jimenez-43b86542
https://linkedin.com/in/marcela-jimenez-43b86542

Sources: role type

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Marcela Jimenez Chief Financial Officer
value seen: CFO
value paraphrased from this source
https://www.altadevelopers.com/about

Sources: since

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Marcela Jimenez Chief Financial Officer
value seen: Jan 2015
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: summary

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Marcela Jimenez Chief Financial Officer
value seen: Marcela Jimenez is Alta’s finance leader, shown by the company as CFO and by her professional profile as VP of Finance and Accounting. Her profile lists business, human-resources and finance education, including a cum-laude master’s degree.
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: tags

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Marcela Jimenez Chief Financial Officer
value seen: CFO; 11+ years at Alta; MBA Finance; Cum Laude
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: title

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Marcela Jimenez Chief Financial Officer
value seen: Chief Financial Officer
https://www.altadevelopers.com/about
SC
Solange Camet Macia
Solange Camet Macia leads operations and sales at Alta. Her profile shows earlier Alta asset-management work and prior operations, marketing and real-estate roles, including ONE Sotheby’s International Realty.
Current title
VP of Operations & Sales
since Jan 2024
Experience
20+ years experience
Companies before
ONE Sotheby’s International RealtyGCL Concierge, LLC / JETUSEWM Realty International
Education
University of FloridaBachelor of Science (BS), Business Management
Other boards
ALTA International Realty — Real Estate Sales Agent
Known for
VP Operations & SalesAsset management
https://linkedin.com/in/solange-c-macia-96888339

Sources: education

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Solange Camet Macia VP of Operations & Sales
value seen: University of Florida — Bachelor of Science (BS), Business Management
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: full name

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Solange Camet Macia VP of Operations & Sales
value seen: Solange Camet Macia
https://www.altadevelopers.com/about

Sources: linkedin page

SOCIALdate not shown in source

LinkedIn profile

LinkedIn
Alta Developers profile identifies this person at Alta Developers
value seen: https://linkedin.com/in/solange-c-macia-96888339
https://linkedin.com/in/solange-c-macia-96888339

Sources: other boards

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Solange Camet Macia VP of Operations & Sales
value seen: ALTA International Realty — Real Estate Sales Agent
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: previous companies

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Solange Camet Macia VP of Operations & Sales
value seen: ONE Sotheby’s International Realty; GCL Concierge, LLC / JETUS; EWM Realty International
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: role type

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Solange Camet Macia VP of Operations & Sales
value seen: DEPARTMENT_HEAD
value paraphrased from this source
https://www.altadevelopers.com/about

Sources: since

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Solange Camet Macia VP of Operations & Sales
value seen: Jan 2024
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: summary

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Solange Camet Macia VP of Operations & Sales
value seen: Solange Camet Macia leads operations and sales at Alta. Her profile shows earlier Alta asset-management work and prior operations, marketing and real-estate roles, including ONE Sotheby’s International Realty.
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: tags

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Solange Camet Macia VP of Operations & Sales
value seen: VP Operations & Sales; 20+ years experience; Asset management
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: title

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Solange Camet Macia VP of Operations & Sales
value seen: VP of Operations & Sales
https://www.altadevelopers.com/about
JR
Jackeline Rivera (Sotelo)
Jackeline Rivera (Sotelo) is a current Alta director and project manager. Her prior project-management experience includes Suffolk Construction, with earlier project-engineering roles at Rudolph and Sletten and Watkins Landmark Construction.
Current title
Director
since Feb 2025
Experience
no career length stated
Companies before
Suffolk ConstructionRudolph and SlettenWatkins Landmark Construction
Education
San Diego State UniversityCivil Engineering
Other boards
none sourced
Known for
DirectorProject managementCivil engineering
https://linkedin.com/in/jackeline-rivera-sotelo

Sources: education

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Director (Current)
value seen: San Diego State University — Civil Engineering
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: full name

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Director (Current)
value seen: Jackeline Rivera (Sotelo)
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: linkedin page

SOCIALdate not shown in source

LinkedIn profile

LinkedIn
Alta Developers profile identifies this person at Alta Developers
value seen: https://linkedin.com/in/jackeline-rivera-sotelo
https://linkedin.com/in/jackeline-rivera-sotelo

Sources: previous companies

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Director (Current)
value seen: Suffolk Construction; Rudolph and Sletten; Watkins Landmark Construction
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: role type

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Director (Current)
value seen: DEPARTMENT_HEAD
value paraphrased from this source
https://www.altadevelopers.com/about

Sources: since

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Director (Current)
value seen: Feb 2025
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: summary

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Director (Current)
value seen: Jackeline Rivera (Sotelo) is a current Alta director and project manager. Her prior project-management experience includes Suffolk Construction, with earlier project-engineering roles at Rudolph and Sletten and Watkins Landmark Construction.
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: tags

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Director (Current)
value seen: Director; Project management; Civil engineering
held out of the figures · the quote does not carry this value
https://www.altadevelopers.com/about

Sources: title

COMPANYdate not shown in source

About Alta Developers | South Florida Real Estate Firm

Alta Developers
### Director (Current)
value seen: Director
https://www.altadevelopers.com/about

Projects

Assessment coverage

Completed projects: 2016-10-15 through 2026-10-15. Initial research is capped at 10 completed projects and a separate delivery-risk search capped at 7 findings. Risk findings are not project assessment counts. Absence is not proof of a complete portfolio or no failures. Month-level dates overlapping a boundary are excluded from figures.

0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.

Stalled, cancelled & overdue projects

0 evidenced cases
The capped delivery-risk search ran; no project-level exception cases are recorded here. Risk findings are listed under Risks and are separate from assessed projects. This does not establish that the developer has no delivery failures.

Completed projects

10 projects
ProjectLocationTypeUnitsFloorsAreaCostPayment planLaunchedConstruction startOriginal targetHandoverDelayConfidenceStatus
Casa Bella Residences by B&B ItaliaMiami, United States
Arts & Entertainment neighborhood
residential for sale319156—USD 580m
gdv
———Sep 2025 – Dec 2025Oct 2026+11.5 mo
(+10.0 to +13.0)
estimatedcompleted
Alana Bay Harbor IslandsBay Harbor Islands, United States
residential for sale3017—————Oct 2024 – Dec 2024Jan 2025 – Dec 2025+7.5 mo
(+1.0 to +14.0)
sourcedcompleted
Crest at Pinecrest Phase IMiami, United States
residential for rent, retail296118———202108/28/2021Jan 2023 – Mar 2023Jan 2023 – Dec 2023+4.5 mo
(−2.0 to +11.0)
sourcedcompleted
Neovita DoralDoral, United States
residential for sale14212 and 3———2014September 2014Sep 2015 – Dec 2015Jan 2022 – Dec 2022+80.0 mo
(+73.0 to +87.0)
sourcedcompleted
Vesta DoralDoral, United States
residential for sale331———————Jan 2022 – Dec 2022—not scorablecompleted
EON Squared North TowersFort Lauderdale, United States
Flagler Village
residential for rent, retail270112——————Jul 2021—not scorablecompleted
Pacifica Boynton BeachBoynton Beach, United States
residential for rent32415———201902/21/2019Jan 2021Jan 2020 – Dec 2020−6.5 mo
(−12.0 to −1.0)
sourcedcompleted
EON Squared South TowersFort Lauderdale, United States
Flagler Village
residential for rent, retail206112——————May 2019—not scorablecompleted
Quadro Miami Design DistrictMiami, United States
Miami Design District
residential for sale198112———2020March 5, 2020Jan 2018 – Dec 2018Jan 2019 – Dec 2019+12.0 mo
(+1.0 to +23.0)
sourcedcompleted
Wynwood BayMiami, United States
residential for rent, retail156119—————Aug 2016Jan 2017 – Dec 2017+10.5 mo
(+5.0 to +16.0)
sourcedcompleted
Click any row for the sources behind it. Cost basis matters: an estimated cost, a construction loan and a sale price are different numbers. Each row states which one it is, so they are never averaged together.

Awards

Awards & recognition

No documented awards or recognitions in the sources reviewed.

Risks

Risk flags

4 found
DELIVERY DELAY May 3, 2022 (reported); temporary certificate of occupancy issued February 6, 2025
Alta Developers took over the stalled, not-yet-started Alana condominium project in Bay Harbor Islands in May 2022 after the prior developer, Ambienta Developers, failed to secure construction financing amid rising costs; Alta relaunched the project, which subsequently received a temporary certificate of occupancy on February 6, 2025, so the delay is historical and was not reported as an Alta-caused default.
DELIVERY DELAY 2022-10-05 publication; Alta page retrieved 2026-10-14 (undated current status)
New River Central in Fort Lauderdale was reported by The Real Deal as expected to start construction in 2023 and be completed in 2025, but Alta Developers’ current project page lists completion as 2029 (planned), documenting a changed and still-future delivery commitment; the 2022 report described the site as vacant and the predecessor tower as never built.
DELIVERY DELAY 2023-08-01 commitment; 2025-02-06 event; 2025-02-10 publication
Alana Bay Harbor Islands, developed by Alta Developers after taking over the stalled Ambienta project, missed the reported late-2024 completion expectation and received a temporary certificate of occupancy on February 6, 2025; subsequent evidence shows the project entered closings and occupancy, so this is a resolved delivery delay rather than an active non-delivery.
LEGAL 2020-05-22 complaint filing; 2020-06-08 publication
The Le Parc at Brickell condominium association sued Parc Brickell One, a joint venture between Alta Developers and Southern Properties Group, alleging that years after the 2017 turnover numerous construction defects—including leaks, cracking and water intrusion—remained unrepaired; Alta said it was working to resolve the concerns, and the retrieved evidence does not establish the later outcome.

Record status

active
Coverageactive
Tracked sinceOctober 10, 2026
Last checkedOctober 14, 2026 this month
Profile last researchedOctober 14, 2026
Claim
Work for this company? Claiming lets you correct the record with sources and get alerts when it changes.
For informational purposes only. This information is not investment, financial or credit advice and should not be relied on for investment, lending or credit decisions. Records may be incomplete or outdated. Verify information independently and seek qualified advice before making a decision.