BroccoliniKirkland, Canada · founded 1949 · 1 active markets
PRIVATE

Broccolini develops, builds, invests in, and manages industrial, residential, commercial, office, and institutional real estate across Canada. Its integrated model serves corporations, public agencies, communities, investors, tenants, and homeowners through development, construction, and long-term property-management solutions from investment to occupancy.

Years in business
77
founded 1949
LinkedIn headcount
384
employees, as shown on LinkedIn · size band 201–500
Projects last researched October 12, 2026
Every figure on this card was read out of a document.

Overview

Investor tear sheet

a summary of the tabs that follow · no rating of our own

Company dossier

Legal name
CONSTRUCTION BROCCOLINI INC./BROCCOLINI CONSTRUCTION INC.1
Headquarters
16766 Aut. Transcanadienne, Suite 5001, Kirkland1, Canada
Founded
19491
Entity type
PRIVATE1
Business model
offplan for sale1, build to rent1, build to sell institutional1, commercial1, mixed use, contracting
Markets
1 market listed
What they build
Industrial (6 of 10) · Office (3 of 10) · Residential, for sale (3 of 10)
Full dossier in About →

Delivery record

7 date-assessed of 10 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
10
within the rolling ten-year window
Median delay
+1.0 mo
the middle of 7 scored projects
Average delay
+3.3 mo
the same projects, pulled by the worst
Average time to deliver
4.2 yrs
start to completion, over 7 delivered projects
Worst slip
+14.5 mo
River & Fifth · +8.0 to +21.0
5
early or less than 6 months late
6 to 12 months late
1
yellow rows below
Over 12 months late
1
red rows below

Against other developers

7 date-assessed here · 49 developers, 236 date-assessed projects in Canada
Median delay
Broccolini·49 developers in Canada
+1.0 mo vs +8.3 mo
this developer 7.3 mo better
The typical project on each side.
Average delay
Broccolini·49 developers in Canada
+3.3 mo vs +12.8 mo
this developer 9.5 mo better
Both pulled by their worst few.
On time
Broccolini·49 developers in Canada
71% vs 44%
this developer 27 pts better
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
Average time to deliver
Broccolini·49 developers in Canada
4.2 yrs vs 4.1 yrs
this developer 0.1 yrs slower
Start to completion, over 7 delivered here and 178 in the market.
Projects and timelines in Track Record →

Resident experience

5 of 10 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
7.4/ 10
Weighted judgment across build and operations · from 5 of 5 rated buildings
Little structure evidence (2 of 5 buildings) — this rests mainly on whole-building and living reviews.
Structure & systems
5.9/ 10
Fabric, services, waterproofing, envelope · from 2 of 5 rated buildings
Management & living
6.6/ 10
Upkeep, response times, amenities, community · from 5 of 5 rated buildings

Against other developers

5 rated here · 50 developers, 246 rated buildings in Canada
Overall rating
Broccolini · 50 other developers in Canada
7.4 vs 7.1
this developer 0.3 better
The weighted verdict on each side. From 5 of 5 rated buildings here and 246 in the market.
Structure & systems
Broccolini · 50 other developers in Canada
— vs 5.7
Too few buildings with this score here to compare (2 of 5)
Fabric and engineering only — fixed at handover. From 2 of 5 rated buildings here and 104 in the market.
Management & living
Broccolini · 50 other developers in Canada
6.6 vs 6.7
this developer 0.1 worse
Upkeep and response — belongs to whoever runs the building now. From 5 of 5 rated buildings here and 225 in the market.
The market here is Canada: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.
Ratings by building →

Awards & recognition

  • RANKING Ranked Published July 29, 2024; performance data as of December 31, 2023
    Global Manager Performance Score League Tables — Real estate opportunistic, 6th
    PitchBook ranked Broccolini sixth globally among real-estate opportunistic fund families, and first among Canadian entries, in the 2023 league tables.
  • PROJECT AWARD Winner May 6, 2023
    Prix Construire 2023 — Chantier d’importance · La Tour de la Banque Nationale (National Bank Place)
    Broccolini Construction won the ACQ’s Chantier d’importance award for its work as general contractor and maître d’œuvre on the National Bank tower in Montréal.
    Association de la construction du Québec (ACQ) · https://www.acq.org/entrepreneurs/evenements/prix-construire/laureats2023/
  • PROJECT AWARD Certified Reported August 16, 2023
    Grands Prix du Design — 16th edition · Broccolini Presentation Centre — Montréal
    The Broccolini Presentation Centre was listed for Gold certifications in agile office environment, commercial showroom and real-estate project sales office, and Silver certifications in common area, collaboration and art integration.
  • 1 more in Awards
All awards →

Risks & source coverage

  • LEGAL Award: January 22, 2021; Superior Court decision: August 2, 2021; Québec Court of Appeal: October 26, 2021; Supreme Court leave refused: April 28, 2022. A Québec Superior Court homologated an arbitration award concerning claims by Lambert Somec Inc. against general contractor Construction Broccolini Inc./Broccolini Construction Inc.; Broccolini’s application to annul the award was rejected, and the Québec Court of Appeal rejected permission to appeal. The Supreme Court of Canada later rejected Broccolini’s leave application, with costs.
  • PROJECT CANCELLED Reported January 12, 2016; council decision reported as occurring January 11, 2016. Broccolini’s proposed Quartier Evolution high-density residential project at the former Merck site in Kirkland did not proceed after Kirkland council withdrew the bylaw amendments required for it; Broccolini said it would reconsider the site’s use, including industrial use. This is an older matter outside the rolling five-year period but is included because it documents a proposed project that failed to move forward.
  • DELIVERY DELAY Reported September 8, 2023; original sales-launch target: 2020. The Riv condominium’s planned sales launch was delayed from 2020 until 2023 because of COVID-19-related delays and a prolonged rezoning and approvals process; construction was still described as a future commitment, dependent on sales, rather than an accomplished completion.
  • 2 more in Risk & Sources
Record status
active
Company sources
100 source entries across 100 fields
Projects tracked
10 · 10 completed in assessment
All flags and sources →

Track Record

Delivery record

7 date-assessed of 10 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
10
within the rolling ten-year window
Median delay
+1.0 mo
the middle of 7 scored projects
Average delay
+3.3 mo
the same projects, pulled by the worst
Average time to deliver
4.2 yrs
start to completion, over 7 delivered projects
Worst slip
+14.5 mo
River & Fifth · +8.0 to +21.0
5
early or less than 6 months late
6 to 12 months late
1
yellow rows below
Over 12 months late
1
red rows below

Against other developers

7 date-assessed here · 49 developers, 236 date-assessed projects in Canada
Median delay
Broccolini·49 developers in Canada
+1.0 mo vs +8.3 mo
this developer 7.3 mo better
The typical project on each side.
Average delay
Broccolini·49 developers in Canada
+3.3 mo vs +12.8 mo
this developer 9.5 mo better
Both pulled by their worst few.
On time
Broccolini·49 developers in Canada
71% vs 44%
this developer 27 pts better
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
Average time to deliver
Broccolini·49 developers in Canada
4.2 yrs vs 4.1 yrs
this developer 0.1 yrs slower
Start to completion, over 7 delivered here and 178 in the market.
The market here is Canada: every other developer whose head office is in the same country, because planning regimes and reporting norms move together within one. It is not a city, a sector or a size band. Read the two delay figures together. A median close to the market with a much better average means no single disaster; the reverse means one project is carrying the record. Time to deliver runs from the earliest start we hold to the completion itself — a construction start where a source gave one, otherwise a sales launch, otherwise the launch year read as its January. A handover the sources place only inside a year is read as that December, so a duration is the widest the record allows rather than the flattering end of it. Only delivered projects dated at both ends count, so it is taken over fewer projects than the delay figures, and a long build is not a fault: a tower is not a villa run. Sourced figures only, both sides, and values taken from documents held on file are excluded here — a developer who shares their records should not score better than one who does not.

Construction start to handover

10 of 10 projects dated · 7 places
Based on covered projects with documented construction or launch dates and available handover dates. Timelines vary by project and may not represent the developer’s full portfolio.
Construction start, or the launchTarget completion (window)Completion or handover, as reportedCurrently statedLaunch year only, no date publishedEarly or ≤6 mo lateOver 6–12 mo lateOver 12 mo lateStalled
Innisfil
Oshawa
Cornwall
Milton
Toronto
Belleville
Montreal
20172018201920202021202220232024202520262027todayINNISFIL+3 moverifiedOSHAWA+1 moverifiedCORNWALLcompleted, no target publishedMILTONcompleted, no target publishedcompleted, no target publishedTORONTO+14.5 moverifiedBELLEVILLE−3.5 moverifiedMONTREAL+8 moverifiedon timeverifiedon timeverified
Click a row in the chart to open a project, or a table row below to see its sources. The chart runs wider than the page where the record spans many years — scroll it sideways to follow a project to its handover. Every date we have is drawn. A hollow marker is only a launch year, not a date anyone published. No dates published means we looked and found none; dates not yet checked means we have not looked yet. Handing over is not finished — rows say which. A delay is shown when one source gives the promised date and another gives the real one, however rough: "2019" still counts, and the row shows how wide that is. Projects missing one of the two dates, or with sources that disagree, are left out of the figures.

Building & Livability Ratings

Resident experience

5 of 10 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
7.4/ 10
Weighted judgment across build and operations · from 5 of 5 rated buildings
Little structure evidence (2 of 5 buildings) — this rests mainly on whole-building and living reviews.
Structure & systems
5.9/ 10
Fabric, services, waterproofing, envelope · from 2 of 5 rated buildings
Management & living
6.6/ 10
Upkeep, response times, amenities, community · from 5 of 5 rated buildings

Against other developers

5 rated here · 50 developers, 246 rated buildings in Canada
Overall rating
Broccolini · 50 other developers in Canada
7.4 vs 7.1
this developer 0.3 better
The weighted verdict on each side. From 5 of 5 rated buildings here and 246 in the market.
Structure & systems
Broccolini · 50 other developers in Canada
— vs 5.7
Too few buildings with this score here to compare (2 of 5)
Fabric and engineering only — fixed at handover. From 2 of 5 rated buildings here and 104 in the market.
Management & living
Broccolini · 50 other developers in Canada
6.6 vs 6.7
this developer 0.1 worse
Upkeep and response — belongs to whoever runs the building now. From 5 of 5 rated buildings here and 225 in the market.
The market here is Canada: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.

By building

5 rated · 5 not rated · scale 1–10
ProjectOverallStructure & systemsManagement & living
Victoria sur le parcMontreal400 units
9.2/ 10
6.0/ 10
6.5/ 10

Platinum Condo Deals has the largest published review base and reports 5.0/5 from 114 ratings, producing a 10.0 anchor under the specified conversion curve. Google Reviews/Maps is materially lower at 4.0/5 from 34 reviews, and the written feedback contains repeated complaints about noise, ventilation, defects and management, moving the result down to 9.2. The structure and living sub-scores are commentary-based indicators from the reported themes, not published platform ratings.

− Poor sound insulation− Ventilation odours− Leaking AC reports− Faulty outlets and door locks− Window-installation concerns
+ 24/7 doormen+ Central location+ Indoor subway access+ Extensive amenities+ Modern lobby
− Poor management responsiveness− Persistent noise− Recurring fire-alarm disruption− Dirty windows− Reported mould in pool and sauna

Residents reported physical and systems problems including “faulty outlets and jammed door locks,” leaking air-conditioning, lifting floorboards, poor window installation and inadequate sound insulation. Another resident described “horrible ventilation system” and food odours, while a separate review alleged that materials were cheap and that pool and sauna areas were mouldy; these are resident reports, not independently verified engineering findings.

Positive feedback highlights “24/7 doormen, location and building amenities,” and another resident praised the “prime location, indoor subway access, extensive amenities” and lobby. Negative reviews repeatedly describe management as unresponsive—“nothing has been done”—alongside unresolved noise, dirty windows and a report that the fire alarm goes off weekly for hours.

628 Saint-JacquesSquare Victoria, Montreal258 units
9.0/ 10
—/ 10
7.7/ 10

Google Reviews/Maps provides the largest published review base found for the building, at 5/5 from 8 reviews; its nominal curve conversion is 10, but the under-10-review rule constrains the result to within one point of 6.5. The visible reviews are consistently positive and add limited commentary uplift for luxury, quietness, appearance and helpful guards. No recurring complaints or published structure-specific rating were found.

+ Well-maintained building+ Attractive building design
+ Helpful guards+ Quiet atmosphere+ High-end experience+ Luxury appearance

The only directly reported physical-condition comment read describes a “Beautiful well maintained building.” Other visible reviews call it a “Beautiful building!” and praise its high-end appearance, but no published review evidence located specific to leaks, plumbing, HVAC, electrical systems or lift failures.

Visible building reviews are uniformly positive: one calls it “A truly high end experience,” another says it is “Vraiment beau, luxueux et tranquille,” and a third praises “excellent and helpful guards Hasan, Nusr, Wali and Yasir.” The review page reports 5.0/5 from 8 reviews, while CondoTrend reports 5.0 based on 2 community ratings but no community comments.

MichelinEastern Ontario, Cornwall
7.5/ 10
—/ 10
7.5/ 10

The only building-specific aggregate located is 4.5/5 from 6 reviews, all apparently visitor/trucker reviews rather than resident reviews. Its market conversion is 8.5, but because the rating base is under 10, the score is constrained to within one point of 6.5; the published comments provide positive operational context but no resident-year evidence or structural rating.

+ New facility
+ Easy entry and exit+ Ample parking/yard space+ Well organized+ Clean areas
− Language barrier at outbound gate

The published reviews describe the site as a “New facility” and praise its organization and cleanliness, but they are short visitor/trucker comments rather than engineering assessments. No published review evidence located here reports defects involving the structure, plumbing, HVAC, electrical systems, leaks or waterproofing.

Visitors describe the operation as “Easy in, easy out,” with “lot of space,” and one says it is “Well organized, clean lots of room.” The only operational criticism in the reviews is a “little bit of a language barrier in the out gate”; the review material concerns a distribution-centre visit, not residential management or amenities.

River & FifthToronto580 units
5.8/ 10
5.8/ 10
5.7/ 10

The largest published review base is Google’s 3.7/5 from 34 reviews, which sets a converted anchor of about 6.1/10. Repeated complaints about management responsiveness and parking, plus one serious systems report involving leaks and HVAC, outweigh recurring praise for amenities, safety and smart-home features, producing a moderate resident score of 5.8/10. Structure is held below the anchor because the reported systems evidence is negative but limited; living is similarly constrained by recurring operational complaints.

+ Above-average materials+ High-quality finishes+ Top-notch appliances
− Reported leaks− HVAC breakdowns− Poor air circulation and trash odour− Broken garage doors/camera
+ Clean amenities+ Smart-home features+ Safe area+ Good views and transit+ Helpful builder customer service
− Unresponsive management− Parking and garage issues− Unexpected unit entries− Long monthly fire-alarm tests− Gym/waste-service delays

Structural feedback is mixed. One resident reported, “Leaks happening within 6months of move in. HVAC regularly breaking down,” and also described trash smell from poor air circulation; other reviews call the finishes high-quality or the materials “above average.” These are resident reports, not an engineering inspection, and the strongest systems complaint appears as a single published review.

Residents repeatedly praise the clean amenities, smart-home features, safety and location; one review says the “front team is overall great,” and another says customer service resolved a major issue. Operational complaints recur more strongly: management is described as unresponsive, with “no one answers for months,” while other reviews mention parking/garage problems, unexpected unit entries and prolonged fire-alarm testing.

Amazon Belleville YGK-1Belleville
5.7/ 10
—/ 10
5.7/ 10

The building-specific Google Reviews/Maps aggregate of 3.6/5 from 58 reviews sets the level, converting to 5.8/10 under the stated curve. The sampled comments consistently concern operational delays and poor appointment handling, warranting a small additional adjustment, while the available evidence does not support a separate structure score.

+ New construction+ Fire-pump and sprinkler installation+ Marked pedestrian and forklift routes
+ Professional and friendly staff reported+ Safety-focused operations+ Break rooms and multi-faith room+ Lactation room+ Well-marked safety routes
− Long unloading waits− Poor appointment handling− Unresponsive receiving staff

The published material describes a new, approximately one-million-square-foot warehouse with marked safety routes and a fire-protection installation comprising two diesel fire pumps, 31 warehouse sprinkler zones, six racking sprinkler zones and approximately 20,000 sprinkler heads. The reviews read did not report flooding, leaks, lift failures or other structural defects; their complaints concerned receiving operations rather than the building fabric.

This is an industrial fulfillment centre, not a residential building, so there is no resident-lifestyle evidence. The available building review aggregate is 3.6/5 from 58 reviews, with sampled complaints that receiving staff “don’t care about your appointment time” and unloading can take “4 to 7 hours”; a separate review described management and staff as “professional and friendly.”

Only buildings that have reached handover are rated. 5 of 10 projects carry no rating: a building still under construction is never asked about, one that has just been handed over may not have been reached yet, and the rest were asked about and no published resident commentary was found. Structure is fixed at handover and stays the developer's; management and living belongs to whoever runs the building now. The overall verdict weights both rather than averaging them. None of this is checked: a rating is what people published about a building, aggregated — it is not evidence, it cannot move a delay figure, and it is not part of the delivery record above.

About

Company dossier

Legal name
CONSTRUCTION BROCCOLINI INC./BROCCOLINI CONSTRUCTION INC.
Headquarters
16766 Aut. Transcanadienne, Suite 500, Kirkland, Canada
H9H 4M7
Founded
1949
Montreal, CA
Entity type
PRIVATE
Revenue
USD 1.07 billion annual revenue
Business model
offplan for sale, build to rent, build to sell institutional, commercial, mixed use, contracting

Offices

head office and 2 others
MississaugaOttawa

Sources: office cities

COMPANYdate not shown in source

Broccolini | End-to-End Real Estate Solutions | Broccolini

Broccolini
Toronto 2680 Skymark Avenue,Suite 800,Mississauga, ON,L4W 5L6(416) 242-7772
value seen: Mississauga
https://www.broccolini.com/en/what-we-do/end-to-end-services

Sources: office cities

COMPANYdate not shown in source

Broccolini | End-to-End Real Estate Solutions | Broccolini

Broccolini
Ottawa 208 Slater St. Ottawa, ON K1P 5H8(514) 737-0076
value seen: Ottawa
https://www.broccolini.com/en/what-we-do/end-to-end-services

Partners

7 partners
Government of Canada
government partner

Triangle Nord Phase 1 is developed in partnership with the Government of Canada.

Government of Québec
government partner

Triangle Nord Phase 1 is developed in partnership with the Government of Québec.

City of Montréal
government partner

Triangle Nord Phase 1 is developed in partnership with the City of Montréal.

Bâtir son quartier
partner

Triangle Nord Phase 1 is developed in partnership with Bâtir son quartier.

Point Commun
partner

Triangle Nord Phase 1 is developed in partnership with Point Commun.

DSV Canada
partner

Broccolini partnered with DSV Canada to deliver a 1.3 million sq.ft. distribution centre in Innisfil, Ontario.

Nokia
partner

Broccolini is Nokia’s development and construction partner for its Ottawa innovation campus.

Sources: name

COMPANYdate not shown in source

Broccolini | Triangle-Nord

Broccolini
Phase 1, developed in partnership with the Government of Canada, the Government of Québec, the City of Montréal, Bâtir son quartier, and Point Commun, will add 376 affordable and community housing units in a 20-storey tower.
value seen: Government of Canada
value paraphrased from this source
https://www.broccolini.com/en/project/triangle-nord

Sources: summary

COMPANYdate not shown in source

Broccolini | Triangle-Nord

Broccolini
Phase 1, developed in partnership with the Government of Canada, the Government of Québec, the City of Montréal, Bâtir son quartier, and Point Commun, will add 376 affordable and community housing units in a 20-storey tower.
value seen: Triangle Nord Phase 1 is developed in partnership with the Government of Canada.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.broccolini.com/en/project/triangle-nord

Sources: name

COMPANYdate not shown in source

Broccolini | Triangle-Nord

Broccolini
Phase 1, developed in partnership with the Government of Canada, the Government of Québec, the City of Montréal, Bâtir son quartier, and Point Commun, will add 376 affordable and community housing units in a 20-storey tower.
value seen: Government of Québec
value paraphrased from this source
https://www.broccolini.com/en/project/triangle-nord

Sources: summary

COMPANYdate not shown in source

Broccolini | Triangle-Nord

Broccolini
Phase 1, developed in partnership with the Government of Canada, the Government of Québec, the City of Montréal, Bâtir son quartier, and Point Commun, will add 376 affordable and community housing units in a 20-storey tower.
value seen: Triangle Nord Phase 1 is developed in partnership with the Government of Québec.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.broccolini.com/en/project/triangle-nord

Sources: name

COMPANYdate not shown in source

Broccolini | Triangle-Nord

Broccolini
Phase 1, developed in partnership with the Government of Canada, the Government of Québec, the City of Montréal, Bâtir son quartier, and Point Commun, will add 376 affordable and community housing units in a 20-storey tower.
value seen: City of Montréal
value paraphrased from this source
https://www.broccolini.com/en/project/triangle-nord

Sources: summary

COMPANYdate not shown in source

Broccolini | Triangle-Nord

Broccolini
Phase 1, developed in partnership with the Government of Canada, the Government of Québec, the City of Montréal, Bâtir son quartier, and Point Commun, will add 376 affordable and community housing units in a 20-storey tower.
value seen: Triangle Nord Phase 1 is developed in partnership with the City of Montréal.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.broccolini.com/en/project/triangle-nord

Sources: name

COMPANYdate not shown in source

Broccolini | Triangle-Nord

Broccolini
Phase 1, developed in partnership with the Government of Canada, the Government of Québec, the City of Montréal, Bâtir son quartier, and Point Commun, will add 376 affordable and community housing units in a 20-storey tower.
value seen: Bâtir son quartier
value paraphrased from this source
https://www.broccolini.com/en/project/triangle-nord

Sources: summary

COMPANYdate not shown in source

Broccolini | Triangle-Nord

Broccolini
Phase 1, developed in partnership with the Government of Canada, the Government of Québec, the City of Montréal, Bâtir son quartier, and Point Commun, will add 376 affordable and community housing units in a 20-storey tower.
value seen: Triangle Nord Phase 1 is developed in partnership with Bâtir son quartier.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.broccolini.com/en/project/triangle-nord

Sources: name

COMPANYdate not shown in source

Broccolini | Triangle-Nord

Broccolini
Phase 1, developed in partnership with the Government of Canada, the Government of Québec, the City of Montréal, Bâtir son quartier, and Point Commun, will add 376 affordable and community housing units in a 20-storey tower.
value seen: Point Commun
value paraphrased from this source
https://www.broccolini.com/en/project/triangle-nord

Sources: summary

COMPANYdate not shown in source

Broccolini | Triangle-Nord

Broccolini
Phase 1, developed in partnership with the Government of Canada, the Government of Québec, the City of Montréal, Bâtir son quartier, and Point Commun, will add 376 affordable and community housing units in a 20-storey tower.
value seen: Triangle Nord Phase 1 is developed in partnership with Point Commun.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.broccolini.com/en/project/triangle-nord

Sources: name

COMPANYdate not shown in source

Broccolini | DSV

Broccolini
Broccolini is proud to have partnered with DSV Canada to deliver a cutting-edge, 1.3 million sq.ft. LEED-certified distribution centre in Innisfil, Ontario.
value seen: DSV Canada
https://www.broccolini.com/en/project/dsv

Sources: summary

COMPANYdate not shown in source

Broccolini | DSV

Broccolini
Broccolini is proud to have partnered with DSV Canada to deliver a cutting-edge, 1.3 million sq.ft. LEED-certified distribution centre in Innisfil, Ontario.
value seen: Broccolini partnered with DSV Canada to deliver a 1.3 million sq.ft. distribution centre in Innisfil, Ontario.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.broccolini.com/en/project/dsv

Sources: name

COMPANY2026-07-09

Broccolini Kicks Off Construction of the Nokia Ottawa Innovation Campus

Broccolini
Construction is now underway on Nokia's new Ottawa innovation campus, a 750,000 sq.ft. R&D facility in the Kanata North Tech Park. Appointed as the project's development and construction partner, Broccolini is delivering the full scope of the campus.
value seen: Nokia
https://www.broccolini.com/en/media/broccolini-kicks-off-construction-of-the-nokia-ottawa-innovation-campus

Sources: summary

COMPANY2026-07-09

Broccolini Kicks Off Construction of the Nokia Ottawa Innovation Campus

Broccolini
Construction is now underway on Nokia's new Ottawa innovation campus, a 750,000 sq.ft. R&D facility in the Kanata North Tech Park. Appointed as the project's development and construction partner, Broccolini is delivering the full scope of the campus.
value seen: Broccolini is Nokia’s development and construction partner for its Ottawa innovation campus.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.broccolini.com/en/media/broccolini-kicks-off-construction-of-the-nokia-ottawa-innovation-campus

Registrations & licences

COMPANY NUMBER1143930650
Corporations Canada / Canada Business Registries · CA · Active
Jurisdiction-agnostic: a DLD number, a Companies House number and a state RERA registration all land in the same table.

Contact

Markets

1 countries
Canadaactive 0 projects tracked
10 of 10 projects carry no country in the record — most of those name only a city — so they are not counted against a market here.

What they build

5 types
Industrial6 of 10
Office3 of 10
Residential, for sale3 of 10
Retail2 of 10
Mixed use1 of 10
A project counts once under each type it carries, so the shares add to more than the project count.

Management

Principals & executives

6 names found
JB
John Broccolini
John Broccolini is a shareholder director and Vice-Chairman of Broccolini. He was the company’s CEO for 25 years and is described as remaining a key contributor, adviser and mentor after the 2022 leadership transition.
Current title
Shareholder director and Vice-Chairman
Experience
25+ years as ceo
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
Shareholder directorVice-ChairmanSecond generation
https://linkedin.com/in/john-broccolini-m-aa07b336

Sources: full name

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Board of Directors John Broccolini Shareholder director and Vice-Chairman
value seen: John Broccolini
https://www.broccolini.com/en/our-team

Sources: linkedin page

SOCIALdate not shown in source

John Broccolini

Independent source · carried by linkedin.com
https://linkedin.com/in/john-broccolini-m-aa07b336
value seen: https://linkedin.com/in/john-broccolini-m-aa07b336
https://linkedin.com/in/john-broccolini-m-aa07b336

Sources: quote

PRESS2022-12-05

Broccolini announces leadership transition to the third generation

Newswire
"Now is the time to officially pass the torch," said John Broccolini.
value seen: Now is the time to officially pass the torch.
https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html

Sources: role type

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Shareholder director and Vice-Chairman
value seen: CHAIR
value paraphrased from this source
https://www.broccolini.com/en/our-team

Sources: summary

PRESS2022-12-05

Broccolini announces leadership transition to the third generation

Newswire
"Outgoing CEO John Broccolini will remain a key contributor and resource as special advisor and mentor to the construction team, and Vice-Chairman of the Board."
value seen: John Broccolini is a shareholder director and Vice-Chairman of Broccolini. He was the company’s CEO for 25 years and is described as remaining a key contributor, adviser and mentor after the 2022 leadership transition.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html

Sources: tags

PRESS2022-12-05

Broccolini announces leadership transition to the third generation

Newswire
"Outgoing CEO John Broccolini will remain a key contributor and resource as special advisor and mentor to the construction team, and Vice-Chairman of the Board."
value seen: Shareholder director; Vice-Chairman; 25 years as CEO; Second generation
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html

Sources: title

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Board of Directors John Broccolini Shareholder director and Vice-Chairman
value seen: Shareholder director and Vice-Chairman
https://www.broccolini.com/en/our-team
JB
Joseph Broccolini
Joseph Broccolini is a shareholder director and second-generation family principal. Independent reporting identifies him as an executive vice-president responsible for leasing and financing major real-estate developments, although the current company leadership page lists him as a shareholder director.
Current title
Shareholder director
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
President, Canadian-Italian Community Foundation
Known for
Shareholder directorSecond generationReal-estate leasingReal-estate financing
https://linkedin.com/in/joseph-broccolini-b319b131

Sources: full name

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Board of Directors Joseph Broccolini Shareholder director
value seen: Joseph Broccolini
https://www.broccolini.com/en/our-team

Sources: linkedin page

SOCIALdate not shown in source

Joseph Broccolini

Independent source · carried by linkedin.com
https://linkedin.com/in/joseph-broccolini-b319b131
value seen: https://linkedin.com/in/joseph-broccolini-b319b131
https://linkedin.com/in/joseph-broccolini-b319b131

Sources: other boards

PRESS2024-04-11

Photos: Mr. Joseph Broccolini, recognized as the Canadian-Italian Business and Professional Association’s 2023 Person of the Year.

Independent source · carried by moetreal.com
He is also deeply involved in philanthropic efforts, serving as President of notable boards, including the Canadian-Italian Community Foundation.
value seen: President, Canadian-Italian Community Foundation
held out of the figures · the quote does not carry this value
https://www.moetreal.com/photos-mr-joseph-broccolini-recognized-as-the-canadian-italian-business-and-professional-associations-2023-person-of-the-year/

Sources: role type

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Shareholder director
value seen: BOARD_MEMBER
value paraphrased from this source
https://www.broccolini.com/en/our-team

Sources: summary

PRESS2024-04-11

Photos: Mr. Joseph Broccolini, recognized as the Canadian-Italian Business and Professional Association’s 2023 Person of the Year.

Independent source · carried by moetreal.com
Mr. Joseph Broccolini, Executive Vice-President of Broccolini, a family-owned, single-source provider of construction, development, and real-estate services, is responsible for securing leasing and financing for its largest real-estate development projects.
value seen: Joseph Broccolini is a shareholder director and second-generation family principal. Independent reporting identifies him as an executive vice-president responsible for leasing and financing major real-estate developments, although the current company leadership page lists him as a shareholder director.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.moetreal.com/photos-mr-joseph-broccolini-recognized-as-the-canadian-italian-business-and-professional-associations-2023-person-of-the-year/

Sources: tags

PRESS2024-04-11

Photos: Mr. Joseph Broccolini, recognized as the Canadian-Italian Business and Professional Association’s 2023 Person of the Year.

Independent source · carried by moetreal.com
responsible for securing leasing and financing for its largest real-estate development projects.
value seen: Shareholder director; Second generation; Real-estate leasing; Real-estate financing
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.moetreal.com/photos-mr-joseph-broccolini-recognized-as-the-canadian-italian-business-and-professional-associations-2023-person-of-the-year/

Sources: title

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Board of Directors Joseph Broccolini Shareholder director
value seen: Shareholder director
https://www.broccolini.com/en/our-team
PB
Paul Broccolini
Paul Broccolini is a shareholder director and second-generation family principal. The company’s 2022 transition announcement credits his leadership, alongside John and Joseph, with expanding Broccolini into major office, residential and logistics projects.
Current title
Shareholder director
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
Shareholder directorOwnerSecond generation
https://linkedin.com/in/paul-broccolini-5863188

Sources: full name

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Board of Directors Paul Broccolini Shareholder director
value seen: Paul Broccolini
https://www.broccolini.com/en/our-team

Sources: linkedin page

SOCIALdate not shown in source

Paul Broccolini

Independent source · carried by linkedin.com
https://linkedin.com/in/paul-broccolini-5863188
value seen: https://linkedin.com/in/paul-broccolini-5863188
https://linkedin.com/in/paul-broccolini-5863188

Sources: role type

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Shareholder director
value seen: BOARD_MEMBER
value paraphrased from this source
https://www.broccolini.com/en/our-team

Sources: summary

PRESS2022-12-05

Broccolini announces leadership transition to the third generation

Newswire
Under his leadership, along with that of my uncles Joseph and Paul, we developed and built some of the country’s most prestigious projects.
value seen: Paul Broccolini is a shareholder director and second-generation family principal. The company’s 2022 transition announcement credits his leadership, alongside John and Joseph, with expanding Broccolini into major office, residential and logistics projects.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html

Sources: tags

SOCIAL2026-09-05

Paul Broccolini

Independent source · carried by linkedin.com
Owner, Exec VP Broccolini
value seen: Shareholder director; Owner; Second generation
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://linkedin.com/in/paul-broccolini-5863188

Sources: title

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Board of Directors Paul Broccolini Shareholder director
value seen: Shareholder director
https://www.broccolini.com/en/our-team
AB
Anthony Broccolini
Anthony Broccolini is the third-generation CEO, responsible for leading the integrated family business with an emphasis on culture and long-term stewardship. He previously served as Managing Director and COO, helping lead expansion into Ontario and high-rise construction, real-estate development, asset management and sustainable construction.
Current title
CEO
since Dec. 5, 2022
Experience
no career length stated
Companies before
none sourced
Education
Architectural Technology
Other boards
Director, Loyola High School FoundationMember, Vanier College Architectural Technology Advisory Board
Known for
CEOThird generationArchitectural TechnologyFormer COOOntario expansion
https://ca.linkedin.com/in/anthonybroccolini
Under his leadership, along with that of my uncles Joseph and Paul, we developed and built some of the country's most prestigious projects—from one of the biggest office buildings in Montreal in the last 30 years, to some of Canada's most iconic high-rise residential developments, to the nation's biggest and most advanced logistics and distribution facilities. Broccolini Dec. 5, 2022https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html

Sources: institution

PRESS2022-12-05

Broccolini announces leadership transition to the third generation

Newswire
After studying Architectural Technology, Anthony dedicated himself to advancing the family business.
value seen: Architectural Technology
value paraphrased from this source
https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html

Sources: full name

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Anthony Broccolini CEO
value seen: Anthony Broccolini
https://www.broccolini.com/en/our-team

Sources: linkedin page

SOCIALdate not shown in source

Anthony Broccolini

Independent source · carried by ca.linkedin.com
https://ca.linkedin.com/in/anthonybroccolini
value seen: https://ca.linkedin.com/in/anthonybroccolini
https://ca.linkedin.com/in/anthonybroccolini

Sources: other boards

PRESS2024-10-04

Loyola Today

Independent source · carried by loyola.ca
Anthony is also actively involved in the business community, serving on several boards including the Loyola High School Foundation.
value seen: Director, Loyola High School Foundation; Member, Vanier College Architectural Technology Advisory Board
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://loyola.ca/sites/default/files/loyola-today/LoyolaToday_Winter_Spring_2024_DIGITAL%28lowres%29%20%281%29.pdf

Sources: quote

PRESS2022-12-05

Broccolini announces leadership transition to the third generation

Newswire
Under his leadership, along with that of my uncles Joseph and Paul, we developed and built some of the country's most prestigious projects—from one of the biggest office buildings in Montreal in the last 30 years, to some of Canada's most iconic high-rise residential developments, to the nation's biggest and most advanced logistics and distribution facilities.
value seen: Under his leadership, along with that of my uncles Joseph and Paul, we developed and built some of the country's most prestigious projects—from one of the biggest office buildings in Montreal in the last 30 years, to some of Canada's most iconic high-rise residential developments, to the nation's biggest and most advanced logistics and distribution facilities.
https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html

Sources: role type

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
CEO
value seen: CEO
value paraphrased from this source
https://www.broccolini.com/en/our-team

Sources: since

PRESS2022-12-05

Broccolini announces leadership transition to the third generation

Newswire
MONTRÉAL, Dec. 5, 2022 /CNW Telbec/ - Broccolini is pleased to announce that Anthony Broccolini has been named CEO
value seen: Dec. 5, 2022
https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html

Sources: summary

PRESS2022-12-05

Broccolini announces leadership transition to the third generation

Newswire
After studying Architectural Technology, Anthony dedicated himself to advancing the family business, helping lead Broccolini’s entry to the Ontario market and developing new niches for the company in the construction of high-rise buildings, real estate development, asset management, and sustainable construction.
value seen: Anthony Broccolini is the third-generation CEO, responsible for leading the integrated family business with an emphasis on culture and long-term stewardship. He previously served as Managing Director and COO, helping lead expansion into Ontario and high-rise construction, real-estate development, asset management and sustainable construction.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html

Sources: title

PRESS2022-12-05

Broccolini announces leadership transition to the third generation

Newswire
Anthony Broccolini has been named CEO, succeeding his father, John Broccolini.
value seen: CEO
https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html
MB
Michael Broccolini
Michael Broccolini is Chief Investment Officer and President of Real Estate, overseeing Broccolini’s real-estate, development and financial activities. He joined the family business in 2011 and is a Concordia John Molson School of Business commerce alumnus; the company says his mandate includes strategic direction and limited partnerships.
Current title
Chief Investment Officer, President of Real Estate
since end of June 2023
Experience
no career length stated
Companies before
none sourced
Education
Concordia University, John Molson School of BusinessBComm
Other boards
none sourced
Known for
Chief Investment OfficerPresident of Real EstateConcordia BCommJoined 2011Third generation
https://ca.linkedin.com/in/michael-broccolini-68b86063

Sources: degree

OTHER2023-04-01

Alumni updates | Spring 2023 | Alumni & friends

Independent source · carried by concordia.ca
Michael Broccolini, BComm, was appointed chief investment officer and president of real estate at Broccolini.
value seen: BComm
https://www.concordia.ca/alumni-friends/magazine/2023-spring/alumni-updates.html

Sources: institution

PRESS2024-12-05

Real estate market forecast with Michael Broccolini: Challenges and opportunities ahead

Independent source · carried by streamly.video
an alumnus of Concordia University’s John Molson School of Business
value seen: Concordia University, John Molson School of Business
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://streamly.video/video/real-estate-market-forecast-with-michael-broccolini-challenges-and-opportunities-ahead

Sources: full name

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Michael Broccolini Chief Investment Officer, President of Real Estate
value seen: Michael Broccolini
https://www.broccolini.com/en/our-team

Sources: linkedin page

SOCIALdate not shown in source

Michael Broccolini

Independent source · carried by ca.linkedin.com
https://ca.linkedin.com/in/michael-broccolini-68b86063
value seen: https://ca.linkedin.com/in/michael-broccolini-68b86063
https://ca.linkedin.com/in/michael-broccolini-68b86063

Sources: role type

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Chief Investment Officer, President of Real Estate
value seen: OTHER
value paraphrased from this source
https://www.broccolini.com/en/our-team

Sources: since

PRESS2022-12-05

Broccolini announces leadership transition to the third generation

Newswire
will become President of Real Estate when current President Roger Plamondon retires at the end of June 2023.
value seen: end of June 2023
https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html

Sources: summary

PRESS2024-12-05

Real estate market forecast with Michael Broccolini: Challenges and opportunities ahead

Independent source · carried by streamly.video
Michael Broccolini, an alumnus of Concordia University’s John Molson School of Business with a degree in Commerce, made his mark in the family business when he joined the ranks in 2011. Currently donning the roles of Chief Investment Officer and President of Real Estate, Michael’s responsibilities are wide ranging, from overseeing our real estate ventures and development projects to navigating the intricate financial landscape that underpins our operations.
value seen: Michael Broccolini is Chief Investment Officer and President of Real Estate, overseeing Broccolini’s real-estate, development and financial activities. He joined the family business in 2011 and is a Concordia John Molson School of Business commerce alumnus.
value paraphrased from this source
https://streamly.video/video/real-estate-market-forecast-with-michael-broccolini-challenges-and-opportunities-ahead

Sources: title

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Michael Broccolini Chief Investment Officer, President of Real Estate
value seen: Chief Investment Officer, President of Real Estate
https://www.broccolini.com/en/our-team
MG
Mario Garippo
Mario Garippo leads Broccolini’s construction business. He joined more than 25 years ago, advanced through increasingly large operations, and led delivery of more than 10 million square feet of Amazon facilities across three markets.
Current title
President, Construction
since end of June 2023
Experience
25+ years at broccolini
Companies before
none sourced
Education
Concordia UniversityBachelor of Engineering, Building Engineering
Vanier CollegeDEC, Architectural Technology/Technician
Other boards
none sourced
Known for
President, ConstructionAmazon deliveryBEng
https://ca.linkedin.com/in/mario-garippo-22b38a63
On a bâti une relation de confiance avec Amazon, avec qui on partage les mêmes valeurs en termes de qualité et de service. Portail Constructo September 9, 2020https://www.portailconstructo.com/actualites/projets/regime_accelere_pour_second_centre_damazon_ottawa

Sources: education

SOCIAL2026-09-24

Mario Garippo

Independent source · carried by ca.linkedin.com
DEC, Architectural Technology/Technician ... Bachelor of Engineering (B.Eng.), Building Engineering
value seen: Bachelor of Engineering, Building Engineering; DEC, Architectural Technology/Technician
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://ca.linkedin.com/in/mario-garippo-22b38a63

Sources: full name

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Mario Garippo President, Construction
value seen: Mario Garippo
https://www.broccolini.com/en/our-team

Sources: linkedin page

SOCIALdate not shown in source

Mario Garippo

Independent source · carried by ca.linkedin.com
https://ca.linkedin.com/in/mario-garippo-22b38a63
value seen: https://ca.linkedin.com/in/mario-garippo-22b38a63
https://ca.linkedin.com/in/mario-garippo-22b38a63

Sources: quote

PRESS2020-09-09

Régime accéléré pour le second centre d’Amazon à Ottawa | Portail Constructo

Independent source · carried by portailconstructo.com
« On a bâti une relation de confiance avec Amazon, avec qui on partage les mêmes valeurs en termes de qualité et de service, mentionne son directeur Construction, Mario Garippo. »
value seen: On a bâti une relation de confiance avec Amazon, avec qui on partage les mêmes valeurs en termes de qualité et de service.
https://www.portailconstructo.com/actualites/projets/regime_accelere_pour_second_centre_damazon_ottawa

Sources: role type

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
President, Construction
value seen: DEPARTMENT_HEAD
value paraphrased from this source
https://www.broccolini.com/en/our-team

Sources: since

PRESS2022-12-05

Broccolini announces leadership transition to the third generation

Newswire
will become president of construction at the end of June 2023.
value seen: end of June 2023
https://www.newswire.ca/news-releases/broccolini-announces-leadership-transition-to-the-third-generation-836129358.html

Sources: summary

PRESS2022-12-07

Broccolini passes torch, new execs at CBRE, CPP, C&W, CDPQ ...

Independent source · carried by renx.ca
Garippo joined the Broccolini team over 25 years ago and has overseen larger and larger construction operations and led the Broccolini construction team to deliver over 10 million square feet of facilities for Amazon in recent years.
value seen: Mario Garippo leads Broccolini’s construction business. He joined more than 25 years ago, advanced through increasingly large operations, and led delivery of more than 10 million square feet of Amazon facilities across three markets.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.renx.ca/broccolini-passes-torch-new-execs-at-cbre-cpp-cw-cdpq

Sources: title

COMPANYdate not shown in source

Broccolini | Our Team | Broccolini Leadership & Expertise

Broccolini
Mario Garippo President, Construction
value seen: President, Construction
https://www.broccolini.com/en/our-team

Projects

Assessment coverage

Completed projects: 2016-10-15 through 2026-10-15. Initial research is capped at 10 completed projects and a separate delivery-risk search capped at 7 findings. Risk findings are not project assessment counts. Absence is not proof of a complete portfolio or no failures. Month-level dates overlapping a boundary are excluded from figures.

0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.

Stalled, cancelled & overdue projects

0 evidenced cases
The capped delivery-risk search ran; no project-level exception cases are recorded here. Risk findings are listed under Risks and are separate from assessed projects. This does not establish that the developer has no delivery failures.

Completed projects

10 projects
ProjectLocationTypeUnitsFloorsAreaCostPayment planLaunchedConstruction startOriginal targetHandoverDelayConfidenceStatus
DSVInnisfil
industrial—————2020Q4-2020Apr 2025 – Jun 2025Jul 2025 – Sep 2025+3.0 mo
(+1.0 to +5.0)
sourcedcompleted
LactalisOshawa
industrial, office——379,000 sq ft——2023September 19, 2023Oct 2024 – Dec 2024Dec 2024+1.0 mo
(0.0 to +2.0)
sourcedcompleted
MichelinCornwall
Eastern Ontario
industrial——1,000,000 sq ftUSD 246m
sale price
—2023August 2023—Oct 2024—not scorablecompleted
Derry Green Industrial ParkMilton
industrial——970,000 sq ft—————Jan 2024 – Dec 2024—not scorablecompleted
River & FifthToronto
residential for sale580141468,000 sq ft—$10,000 on Signing; Balance to 5% in 30 days; 5% in 180 Days; 2.5% in 720 days; 2.5% in 1000 days; 5% on Occupancy12019June 2019Mar 2023 – May 2023Jan 2024 – Dec 2024+14.5 mo
(+8.0 to +21.0)
sourcedcompleted
Amazon Belleville YGK-1Belleville
industrial——1,050,000 sq ft——2022July 2022Sep 2023 – Nov 2023Jan 2023 – Dec 2023−3.5 mo
(−10.0 to +3.0)
sourcedcompleted
BDC LowesMilton
industrial——750,000 sq ft—————Jan 2023 – Mar 2023—not scorablecompleted
National Bank PlaceMontreal
Quartier de l'innovation
office—40———2018Nov. 7, 2018Sep 2022 – Dec 2022Jan 2023 – Dec 2023+8.0 mo
(+1.0 to +15.0)
sourcedcompleted
Victoria sur le parcMontreal
mixed use, residential for sale, office, retail400158330,000 sq ft——2018October 20, 2018Jan 2023 – Dec 2023Jan 2023 – Dec 20230.0 mo
(−11.0 to +11.0)
sourcedcompleted
628 Saint-JacquesMontreal
Square Victoria
residential for sale, retail258135—CAD 150m
estimated cost
$3,000 with Agreement, Balance to 5% in 10 days, 5% in 90 days, 5% in 180 days, 5% in 365 days1201710 octobre, 2017Jan 2021 – Dec 2021Jan 2021 – Dec 20210.0 mo
(−11.0 to +11.0)
sourcedcompleted
Click any row for the sources behind it. Cost basis matters: an estimated cost, a construction loan and a sale price are different numbers. Each row states which one it is, so they are never averaged together.

Awards

Awards & recognition

4 found
RANKING Ranked Published July 29, 2024; performance data as of December 31, 2023
Global Manager Performance Score League Tables — Real estate opportunistic, 6th
PitchBook ranked Broccolini sixth globally among real-estate opportunistic fund families, and first among Canadian entries, in the 2023 league tables.
PROJECT AWARD Winner May 6, 2023
Prix Construire 2023 — Chantier d’importance · La Tour de la Banque Nationale (National Bank Place)
Broccolini Construction won the ACQ’s Chantier d’importance award for its work as general contractor and maître d’œuvre on the National Bank tower in Montréal.
Association de la construction du Québec (ACQ) · https://www.acq.org/entrepreneurs/evenements/prix-construire/laureats2023/
PROJECT AWARD Certified Reported August 16, 2023
Grands Prix du Design — 16th edition · Broccolini Presentation Centre — Montréal
The Broccolini Presentation Centre was listed for Gold certifications in agile office environment, commercial showroom and real-estate project sales office, and Silver certifications in common area, collaboration and art integration.
SUSTAINABILITY Certified November 15, 2016
LEED Gold certification · Broccolini Corporate Centre 2
The Broccolini Corporate Centre 2 became the first LEED Gold-certified office building in Saint-Laurent, with certification recognized on November 15, 2016.

Risks

Risk flags

5 found
LEGAL Award: January 22, 2021; Superior Court decision: August 2, 2021; Québec Court of Appeal: October 26, 2021; Supreme Court leave refused: April 28, 2022.
A Québec Superior Court homologated an arbitration award concerning claims by Lambert Somec Inc. against general contractor Construction Broccolini Inc./Broccolini Construction Inc.; Broccolini’s application to annul the award was rejected, and the Québec Court of Appeal rejected permission to appeal. The Supreme Court of Canada later rejected Broccolini’s leave application, with costs.
PROJECT CANCELLED Reported January 12, 2016; council decision reported as occurring January 11, 2016.
Broccolini’s proposed Quartier Evolution high-density residential project at the former Merck site in Kirkland did not proceed after Kirkland council withdrew the bylaw amendments required for it; Broccolini said it would reconsider the site’s use, including industrial use. This is an older matter outside the rolling five-year period but is included because it documents a proposed project that failed to move forward.
DELIVERY DELAY Reported September 8, 2023; original sales-launch target: 2020.
The Riv condominium’s planned sales launch was delayed from 2020 until 2023 because of COVID-19-related delays and a prolonged rezoning and approvals process; construction was still described as a future commitment, dependent on sales, rather than an accomplished completion.
PROJECT CANCELLED Published January 25, 2025; status reported as of that date (the proposal had been discussed since 2021).
Amazon distribution-centre proposal on Broccolini-owned land in Anjou/Montréal-Est was abandoned before construction; reporting says the project never became final, the previously discussed 2023 construction did not occur, and the site remained vacant, while Amazon shifted away from in-house Quebec delivery centres.
PROJECT CANCELLED Published July 16, 2026; first version reported as having failed in spring 2026.
The first version of the 810 rue Saint-Antoine Est residential project by the Broccolini–Pur Immobilia development partnership failed after citizen opposition triggered a referendum, but a modified version was subsequently authorized to proceed; the cancelled first iteration should not be treated as an active failure.

Record status

active
Coverageactive
Tracked sinceOctober 11, 2026
Last checkedOctober 12, 2026 this month
Profile last researchedOctober 12, 2026
Claim
Work for this company? Claiming lets you correct the record with sources and get alerts when it changes.
For informational purposes only. This information is not investment, financial or credit advice and should not be relied on for investment, lending or credit decisions. Records may be incomplete or outdated. Verify information independently and seek qualified advice before making a decision.