Deicorp develops and builds transport-connected homes, mixed-use precincts, retail and commercial spaces across Sydney. Its customers include apartment buyers, families, investors, essential workers and renters, with projects spanning off-plan sales, build-to-rent, community housing and integrated construction delivery for residents locally.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
| Project | Overall | Structure & systems | Management & living |
|---|---|---|---|
| ProximityRouse Hill, Sydney375 units | 6.9/ 10 | —/ 10 | 6.9/ 10 |
The Google Reviews/Maps building aggregate of 4/5 from 22 reviews sets the level, converting to 7/10 under the specified curve. The score is modestly reduced by repeated reports of prolonged power interruptions and weak property-management responsiveness, partly offset by repeated praise for location and helpful staff. No structure score is assigned because the published material did not provide a structural rating or engineering evidence. | |||
Residents reported a 24-hour loss of power on a 43-degree day and another review described being without power for “12 hrs and counting”; both accounts also mention fire alarms or power-cut problems. These are operational infrastructure reports rather than a published engineering assessment, and no separate structural rating was found. | Daily-life feedback is mixed: residents praised the location and described staff as helpful, including one saying a representative responded “within a very short period of time.” However, other reviews report “There is no property Manager,” prolonged power loss during extreme heat, fire-alarm concerns and a blocked rubbish chute with the dumpster room locked. | ||
| The BanksRockdale, Sydney266 units | 6.7/ 10 | —/ 10 | 6.7/ 10 |
The building-specific aggregate of 3.9/5 from 11 reviews sets the anchor; using the stated conversion curve, this is approximately 6.7/10. The available written comments include one serious lift complaint and one noise/management complaint, but neither is recurring across multiple separate reviews, so no additional commentary adjustment is applied. | |||
One resident reported that the lift had broken five times within two months of settlement, calling the situation “Terrible!!!” This is a single serious infrastructure report rather than a recurring theme, and no broader published evidence on plumbing, HVAC, electrical systems or waterproofing was found. | The visible reviews include positive comments such as “Extremely professional” and “Very good customer service over the phone, reception & services.” A later resident complained that parties started “after 10pm weekdays and overnight on weekends” and said reports to management were “rubbish”; this is a single review, not a demonstrated recurring management pattern. | ||
| Petersham PrecinctPetersham, Sydney357 units | 6.3/ 10 | —/ 10 | 6.1/ 10 |
The Siding Petersham’s building-specific aggregate is 3.7/5 from three reviews, which sets the level but is below the ten-review anchor threshold; the resulting conversion is kept within one point of 6.5 because the evidence base is small. The two positive reviews mention quietness, convenience and a generally good experience, while one review reports a substantial historical delivery delay. No published building-specific structural rating or physical-condition review evidence was found, so structure is unscored. | |||
no notes returned no links returned | The published review set describes a quiet, convenient location, including a review saying the development is “5 minutes” from the station and “15 minutes” to Town Hall by train. The main negative is historical rather than a current building-operations complaint: one reviewer reported a “9 months delay in a 14-month project” and alleged buyers were harmed by Deicorp’s promises; a separate review simply said “good.” |
Co-delivers Deicorp’s 397-dwelling Westmead Build to Rent project.
Co-delivers the Westmead Build to Rent project with Deicorp and AXA IM Alts.
Provided a AUD 150 million loan that part-funded the Westmead project.
Worked with Deicorp on the Pemulwuy project, delivering 62 affordable dwellings plus community facilities.
Entered a joint venture with Deicorp for the AUD 1.8 billion Kings Bay Village development in Five Dock.
Joined Deicorp to deliver a key retail and residential site in the AUD 700 million Melrose Park project.
Led the Hills Showground Station Precinct initiative for which Deicorp was selected to deliver the East and Village precincts.
Co-led the Hills Showground Station Precinct initiative with Landcom; Deicorp was selected to deliver precinct components.
Partnered with Deicorp on a purpose-built student accommodation component of the East Zetland/Avenues precinct.
Partnered with Deicorp and Trilogy Hotels to bring a DoubleTree by Hilton hotel to Cosmopolitan.
Partnered with Deicorp and Hilton on the DoubleTree by Hilton hotel at Cosmopolitan.
At the site of the 397 dwelling Build to Rent project Deicorp is delivering with AXA IM Alts and St George Community Housing (SGCH) in Westmead
At the site of the 397 dwelling Build to Rent project Deicorp is delivering with AXA IM Alts and St George Community Housing (SGCH) in Westmead
The Westmead project, part-funded by a $150 million loan from Housing Australia
Fouad Deiri and Deicorp established a strong working relationship with the Aboriginal Housing Company to help them realise their vision for the Pemulwuy project in Redfern, delivering 62 affordable housing dwellings
Metrics Real Estate Partners (‘Metrics’) and leading developer Deicorp announcing a joint venture on the $1.8 billion Kings Bay Village development in Five Dock
Payce, the Australian owned property company behind the Melrose Park precinct, and privately owned developer Deicorp will join forces to deliver a key retail and residential site
The development forms part of the Hills Showground Station Precinct – an urban renewal initiative led by Landcom and Sydney Metro. Deicorp was selected to deliver both the East and Village precincts
The development forms part of the Hills Showground Station Precinct – an urban renewal initiative led by Landcom and Sydney Metro. Deicorp was selected to deliver both the East and Village precincts
delivered in partnership with Scape
| COMPANY NUMBER | 138 180 337 Australian Securities and Investments Commission (ASIC) · AU · Active |
| Australia | active 9 projects tracked |
| Residential, for sale | 9 of 9 |
| Mixed use | 7 of 9 |
| Retail | 2 of 9 |
| Other | 1 of 9 |
From the outset, the ambition for Deicorp was to deliver great homes for our purchasers and to create a business built on integrity and professionalism.Construction Outlook https://www.construction-outlook.com/property-development/deicorp-sydneys-trusted-property-partner
Fouad Deiri OAM Founder and Chairman
https://linkedin.com/in/fouad-deiri-oam-86999766
From the outset, the ambition for Deicorp was to deliver great homes for our purchasers and to create a business built on integrity and professionalism.
Fouad Deiri OAM Founder and Chairman
Founder and Chairman - Deicorp (Current) 1999 - Present
The company was established by Fouad Deiri in 1999, who strived to combine his skills as a builder with his passion for development. He commenced his career as an apprentice carpenter
Founder
Apprentice carpenter
Fouad Deiri OAM Founder and Chairman
FCPA
Deakin University
Grad Dip BA
Deakin University
Bruce Rayner Executive Director (formerly Chief Financial Officer)
https://linkedin.com/in/bruce-rayner-32ba33a
Meriton Properties Pty Ltd
Leda Holdings Pty Ltd
Atkinson Gore Group Pty Ltd
Abigroup Asset Services Pty Ltd
Bruce Rayner Executive Director (formerly Chief Financial Officer)
Executive Director - Deicorp Properties Pty Ltd (Current) Jun 2026 - Present
Extensive experience with Industry Leaders in; Construction & Project Development. Contract Management & Reporting. Financial Services. Transition Management & Project Delivery.
Executive Director
CFO
FCPA
Bruce Rayner Executive Director (formerly Chief Financial Officer)
B.Civil Engineering, Engineering & Construction Management
University of Technology, Sydney
George Gregoire Head of Projects
https://linkedin.com/in/george-gregoire-7364a514
Total Construction
Lecan Constructions
Manu Construction and Project Management
Hannas
Cardinal Project Services
George Gregoire Head of Projects
Head of Projects - Deicorp (Current) Sep 2020 - Present
Total Experience: 29 years and 2 months
Head of Projects
29 years experience
George Gregoire Head of Projects
Associate Diploma Architectural Drafting
TAFE NSW
Associate Diploma Applied Science - Building, Construction Management
TAFE NSW
Andrew Coleman Development & Construction Executive
https://linkedin.com/in/andrew-coleman-maipm-cppd-91150380
Meriton Group
Mirvac
Andrew Coleman Development & Construction Executive
Development & Construction Executive - Deicorp (Current) Mar 2018 - Present
Total Experience: 28 years and 8 months
Construction & Development Executive
ex-Meriton
Andrew Coleman Development & Construction Executive
Greg Colbran Development & Planning Executive
https://au.linkedin.com/in/greg-colbran-3a382a2b4
Greg Colbran Development & Planning Executive
This was when Greg Colbran, Deicorp's development and planning manager, crossed the railway tracks to introduce himself to Mundine
Development & Planning Executive
Greg Colbran Development & Planning Executive
Bilinda Turner Head of Retail
https://linkedin.com/in/bilinda-turner
PAYCE
Vicinity Centres
Bilinda Turner Head of Retail
Head of Retail - Deicorp (Current) Feb 2023 - Present
In my current role, I am responsible for the overall retail design, operational outcomes, income forecasts, major tenant leasing/store delivery and the group liaison with legal, contractors and builders from concept to launch of our mixed-use retail developments.
Head of Retail
27+ years property
Bilinda Turner Head of Retail
1 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.
| Project | Location | Type | Units | Floors | Area | Cost | Payment plan | Launched | Construction start | Original target | Handover | Delay | Confidence | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Petersham Precinct | Sydney, Australia Petersham | mixed use, residential for sale, other | 3571 | 5–8 storeys at 3–7 Regent Street; 6–7 storeys at 13–17 Regent Street; 2–11 storeys at 287–309 Trafalgar Street and 16–20 Fisher Street | — | — | — | 2018 | 23 April 2018 | Sep 2018 – Dec 2018 | Mar 2026 | +88.5 mo (+87.0 to +90.0) | sourced | completed |
| Hills Showground Village | Sydney, Australia Castle Hill | mixed use, residential for sale, retail | 4301 | Four 20-level residential towers over a three-level retail precinct | 9,500 m² | — | — | 2022 | Thursday 17 November 2022 | Aug 2025 | Aug 2025 | 0.0 mo (0.0 to 0.0) | estimated | completed |
| The Rothschild | Sydney, Australia Rosebery | residential for sale, mixed use | 1761 | — | — | — | — | — | — | Jan 2025 – Apr 2025 | Feb 2025 | −0.5 mo (−2.0 to +1.0) | estimated | completed |
| Tallawong Village Stage 1 | Sydney, Australia Tallawong | mixed use, residential for sale, retail | 3331 | — | 9,000 m² | — | — | — | — | Sep 2024 | Oct 2024 | +1.0 mo (+1.0 to +1.0) | sourced | completed |
| Downtown | Sydney, Australia Zetland | mixed use, residential for sale | 5461 | — | — | — | 10%* (balance at setlement)1 | 2024 | 17 March 2024 | May 2024 – Aug 2024 | Jan 2024 – Dec 2024 | 0.0 mo (−7.0 to +7.0) | sourced | completed |
| The Ashford | Sydney, Australia Castle Hill | residential for sale | — | — | — | — | 5% deposit, remaining balance payable upon settlement1 | — | — | May 2024 – Aug 2024 | Jan 2024 – Dec 2024 | 0.0 mo (−7.0 to +7.0) | sourced | completed |
| Proximity | Sydney, Australia Rouse Hill | residential for sale | 3751 | Six buildings from 6 to 11 storeys | — | — | — | 2020 | 2020-11-10 | Jan 2023 – Dec 2023 | Jan 2023 – Dec 2023 | 0.0 mo (−11.0 to +11.0) | sourced | completed |
| The Anders | Sydney, Australia Ashfield | residential for sale, mixed use | 881 | High-Rise; eight buildings | — | — | — | 2021 | 2021-05-21 | May 2023 – Aug 2023 | Jan 2023 – Dec 2023 | 0.0 mo (−7.0 to +7.0) | sourced | completed |
| The Banks | Sydney, Australia Rockdale | residential for sale, mixed use | 2661 | — | — | — | — | — | — | Jan 2022 – Dec 2022 | Jan 2022 – Dec 2022 | 0.0 mo (−11.0 to +11.0) | sourced | completed |
| Equifax | iCIRT 3*+ last rated Mar 2023 |
| Coverage | active |
| Tracked since | October 11, 2026 |
| Last checked | October 11, 2026 this month |
| Profile last researched | October 11, 2026 |
| Claim |