Devimco develops mixed-use urban destinations in Quebec, combining condominiums, rental apartments, offices, shops, recreational spaces and public realms. Its projects target homebuyers, renters, businesses, visitors and communities seeking integrated, transit-oriented environments mainly in Greater Montreal and southern Quebec municipalities today.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
| Project | Overall | Structure & systems | Management & living |
|---|---|---|---|
| Lumeo Sud ApartmentsSolar Uniquartier, Brossard246 units | 8.0/ 10 | —/ 10 | 8.0/ 10 |
Aucune note agrégée propre à Lumeo Sud n’a été confirmée dans les sources consultées; la note publiée de 3,8/5 trouvée pour « Lumeo » à une autre adresse n’a donc pas été attribuée à ce bâtiment. Le score repose uniquement sur les trois témoignages positifs de locataires publiés sur la page du projet; selon la règle applicable à moins de trois avis écrits, aucune majoration au-delà de 8 n’est permise, et les informations structurelles restent non évaluées. | |||
no notes returned no links returned | Les témoignages publiés par Devimco décrivent une expérience quotidienne positive : « l’environnement est agréable et toujours propre » et « la gestion est serviable et chaleureuse ». Un autre locataire apprécie la formule tout inclus et affirme que « les installations sont parfaites », tandis qu’un troisième cite le professionnalisme, le respect et la qualité de vie. Ces témoignages sont favorables mais proviennent de la page promotionnelle du projet, et non d’un agrégat indépendant. | ||
| Maestria Tour AQuartier des spectacles, Montreal | 6.5/ 10 | 5.5/ 10 | 6.9/ 10 Google Reviews/Maps 4/5 · 122 reviews · bestrealestateagency.ca Google Reviews/Maps publishes 4/5 from 122 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 6.9. |
The largest published review base is the complex Google listing at 3.0/5 from 233 reviews, which converts to 7.0 under the requested curve. The score is reduced for serious reported water/glass incidents and recurring operational complaints, with a small offset for repeated praise of the amenities, architecture and professional team; structure is scored lower because the published evidence is dominated by physical failures and regulator findings. | |||
Published reporting describes a major Tour A water incident in which a corridor became “un petit lac” and “il a fallu qu’ils arrachent tous les murs.” La Presse also reported 18 unexplained glass breakages across the complex since 2024 and said the building regulator had identified non-conformities involving the building, plumbing, elevators, gas and electricity; the regulator said those non-conformities had been corrected by the publication date. | The published Google review summary reports a 3.0/5 result from 233 reviews, with elevators, fire alarms, maintenance and construction noise among the most-mentioned topics; the same material says residents praise the spa, pool, architecture and location. A July 2026 co-owner petition alleges “poor communication, delayed responses, inadequate follow-up” and ongoing maintenance shortcomings, while a resident described the amenities as “honestly great,” showing a materially divided daily-living picture. | ||
| Sir Charles CondominiumsLongueuil new downtown, Longueuil366 units | 5.9/ 10 | 5.0/ 10 | 5.5/ 10 |
Google Reviews/Maps supplies the only building-level aggregate located: 3.6/5 from 16 resident reviews, converted to approximately 5.9/10 before commentary. Repeated complaints about management, amenity availability and system reliability outweigh repeated praise, producing 5.5/10 overall; structure is held at 5.0/10 because written evidence includes heating and elevator reliability complaints but no structural aggregate. | |||
Published resident feedback includes “the heating is often broken” and says “the elevators are frequently out of service.” Other reviews describe the building as “bien construit” and praise its details and finishes, but no independent engineering rating was published. | Resident reviews praise staff as “very nice and always willing to go out of their way to help,” while another says management is “very problematic” and facilities are often unusable. A January 2026 local report says visitor-parking frustration is “généralisée” among residents, with no dedicated visitor spaces and a $15 daily P2 option. | ||
| Wellington sur le BassinGriffintown, Montreal380 units | 5.7/ 10 | —/ 10 | 5.5/ 10 |
Google Reviews/Maps provides the only published building-specific aggregate located: 3.3/5 from six reviews. Because the review base is below ten, the score is kept within one point of 6.5 as required; no recurring complaint adjustment is applied because only one written complaint was available and no structural evidence was published. | |||
no notes returned no links returned | The available review evidence is limited: the listing reports an overall 3.3/5 from six reviews, and the one review text visible alleges that garbage was not collected and that rats were coming from containers on Murray Street. This is an operational complaint, not evidence of a structural or building-systems defect; the page does not provide enough resident feedback to establish a recurring theme. | ||
| Oria Condominiums – Phase 1Solar Uniquartier, Brossard158 units | 5.4/ 10 | —/ 10 | 4.4/ 10 |
The building-specific aggregate is 3.2/5 from 21 reviews, which sets the anchor at 4.6/10 under the supplied conversion curve. The reported recurring complaints outweigh the recurring praise modestly, producing a 4.4/10 resident-experience score; no separate published structure rating was found, so structure remains unevidenced as a scored subdimension. | |||
Structural comments were mixed. One reviewer said the unit was “well built” and that inspection findings were taken seriously, while another reported “poor finishing” and hearing neighbors and children throughout the building; a further review called for “1 more elevator” and a higher-quality elevator. | Daily-life feedback is polarized. Positive reviews describe “beautiful designs,” a “fully bilingual friendly” team and a luxurious area with restaurants, while negative reviews describe very small units and amenities, persistent noise, and sales staff who “barely answer your calls.” | ||
| MaryRobertDistrict Griffin, Montreal477 units | 5.0/ 10 | 5.0/ 10 | —/ 10 |
Aucune plateforme consultée ne publie de note agrégée propre à MaryRobert; le résultat repose donc sur les huit commentaires écrits effectivement lus. Leur tonalité est partagée mais légèrement négative sur l'apparence, avec quelques appréciations de la conception et de la localisation. L'absence de commentaires sur les ascenseurs, fuites, plomberie, HVAC, sécurité ou gestion n'est pas comptée comme un défaut. | |||
Les seules observations physiques publiées retrouvées sont visuelles et subjectives, non des rapports d'ingénierie ou de défaillances. Les critiques parlent de « collants posés sur les garde-fou en verre » et d'un basilaire « absolument tragique », alors que d'autres apprécient la forme non rectangulaire et l'effet visuel de l'œuvre. | Les commentaires disponibles décrivent surtout le contexte de vie de Griffintown, pas la gestion quotidienne de la copropriété. Un commentateur parle d'une partie commerciale « vraiment conviviale » et d'une localisation « ultra favorable pour les transports actifs », tandis qu'un autre décrit le secteur Devimco comme « plutôt inégal » et parfois décevant. | ||
| Maestria Tour BQuartier des spectacles, Montreal | 4.9/ 10 | 3.0/ 10 | 4.0/ 10 |
The largest published review base was the Maestria Google cluster listing at 3.0/5 from 233 reviews, which converts to 4.0 under the specified curve. The score was reduced because the report contains a serious Tour B plumbing/water-damage record and repeated building-operation complaints, with a small offset for recurring amenity and design praise. The evidence is cluster-level for the Google ratings, while the most serious physical-condition reporting specifically identifies Tour B. | |||
La Presse reported 15 water-damage incidents in Tour B during 2026; one toilet-related plumbing failure on August 6 affected roughly 40 units from the 44th floor to the ground floor. The same report said similar window-related non-conformities were detected in Tour B, along with issues involving plumbing, elevators, gas and electricity, while the Régie du bâtiment said those identified non-conformities had been corrected by publication. These are event and publication-date findings, not evidence that every issue remained unresolved on October 12, 2026. | The published Google snapshot was sharply split: 103 five-star and 103 one-star reviews, with elevators and fire alarms the most-mentioned topics. Forum material includes a resident’s report of “constant loud construction noises” and complaints about crowded gym/spa facilities, but another resident said the amenities were “honestly great,” particularly the indoor spa; the available evidence therefore supports a mixed day-to-day experience. | ||
| Nobel au Solar UniquartierSolar Uniquartier, Brossard | 4.8/ 10 | 4.0/ 10 | 3.5/ 10 |
The largest published review base is the 3.2/5 rating from 97 reviews, which sets a 4.0/10 anchor under the requested conversion curve. The second aggregate is close, so it does not create a material dissent. The score is reduced for the documented service and systems complaints but partly supported by repeated praise for REM access, amenities, staff and location; structure is scored separately because the report contains specific HVAC, ceiling and infiltration evidence. | |||
Published resident feedback includes “NO AC for weeks” and “heater down in the winter,” while another review reports a ceiling hole that remained for five months. A September 2026 independent property guide also reports 2024 tenant complaints concerning air conditioning and infiltrations and says the condominium syndicate was among Devimco projects involved in litigation over alleged “vices de construction et de conception”; these are reported claims, not a determination that defects exist. | Residents consistently praise the location and direct REM connection: one called it “Great location, easy access to the Dix30 and R.E.M.,” and another said the building was safe with helpful staff and rapidly scheduled maintenance. The negative reviews describe parking shortages, a dirty recycling room and delayed responses; one resident also reported a dispute in which a guard allegedly sought a $200 package fine, while another said the building was “too crowded, specially during the summer.” | ||
| Auguste Condominiums – Phase 1Quartier des lumières, Montreal265 units | 4.2/ 10 | 2.0/ 10 | 1.9/ 10 |
The largest published review set is the Google aggregate shown by Birdeye: 2.2/5 from 46 reviews, converted to a 2.4/10 anchor. The reported hot-water failure, ventilation issue, soundproofing complaint and repeated management-response complaints pull the resident-experience result down to 1.9 overall; the evidence is cluster-level and should not be treated as a clean Phase-1-only rating. | |||
The published resident feedback contains no positive engineering evidence. One reviewer reported, “We have not had hot water for a week now,” and also said the ventilation-control panel had been dead for a month; another wrote, “Soundproof? Not even close,” describing noise from the upstairs neighbour. | Operational feedback is sharply negative: one resident called Gestion Provision “The worst management company” and said staff “never answer phone calls” and “ignore emails constantly.” Another reviewer said they had already paid for the month but had not received a response about when they would get the keys. |
It partnered with Devimco on the Auguste & Louis Phase 2 project and other Montreal developments.
It partnered with Devimco and the Fonds immobilier de solidarité FTQ on Auguste & Louis Phase 2.
MACH gave Devimco responsibility for developing the condominium portion of the Quartier des lumières mixed-use project.
It is identified as a partner of Devimco and the Fonds immobilier de solidarité FTQ on Solar Uniquartier.
Devimco and Concordia partnered to found the university’s Next-Generation Cities Institute.
Today, Groupe Devimco and its partners, Fonds immobilier de solidarité FTQ and Fiera Real Estate, proceeded to the official groundbreaking ceremony for the Auguste & Louis Phase 2 project.
Today, Groupe Devimco and its partners, Fonds immobilier de solidarité FTQ and Fiera Real Estate, proceeded to the official groundbreaking ceremony for the Auguste & Louis Phase 2 project.
Today, Groupe Devimco and its partners, Fonds immobilier de solidarité FTQ and Fiera Real Estate, proceeded to the official groundbreaking ceremony for the Auguste & Louis Phase 2 project.
Today, Groupe Devimco and its partners, Fonds immobilier de solidarité FTQ and Fiera Real Estate, proceeded to the official groundbreaking ceremony for the Auguste & Louis Phase 2 project.
MACH is giving Devimco Immobilier responsibility for developing the condominium portion of its mixed-use project.
MACH is giving Devimco Immobilier responsibility for developing the condominium portion of its mixed-use project.
Réalisé par le Groupe Devimco, en partenariat avec le Fonds immobilier de solidarité FTQ et Fondaction, Solar Uniquartier s’impose comme le plus important projet de développement immobilier mixte au Québec.
Réalisé par le Groupe Devimco, en partenariat avec le Fonds immobilier de solidarité FTQ et Fondaction, Solar Uniquartier s’impose comme le plus important projet de développement immobilier mixte au Québec.
Devimco and Concordia University recently partnered to found the university’s Next-Generation Cities Institute.
Devimco and Concordia University recently partnered to found the university’s Next-Generation Cities Institute.
| COMPANY NUMBER | 1168786938 Registraire des entreprises du Québec · CA · Registered |
| Canada | active 9 projects tracked |
| Residential, for sale | 8 of 9 |
| Retail | 8 of 9 |
| Residential, for rent | 4 of 9 |
| Mixed use | 3 of 9 |
We were the first to offer a mix of condos and rental apartments.La Presse October 11, 2022https://www.lapresse.ca/affaires/2022-10-11/grande-entrevue-serge-goulet-pdg-de-devimco/une-machine-a-developper-bien-huilee.php
Serge Goulet Président
"We were the first to offer a mix of condos and rental apartments."
il crée Devimco Immobilier en 1997, aujourd’hui connu sous le nom Groupe Devimco. ... il entreprend en 2013 le projet Solar Uniquartier
Founder; President; Commercial real estate; Mixed-use development
Serge Goulet Président
Being a real estate developer means always being in problem-solving mode to improve the area and create value for communities, the city and investors.LUXE Magazine February 22, 2022https://magazineluxe.com/mathieu-jobin-devimco-immobilier/
Université Laval
Co-fondateur de Devimco Immobilier, Mathieu Jobin occupe ... le poste de directeur général associé de l’entreprise.
Mathieu Jobin
"Being a real estate developer means always being in problem-solving mode to improve the area and create value for communities, the city and investors."
En décembre 2012, il fonde Devimco Immobilier avec Serge Goulet.
Attitré principalement au montage des partenariats et des financements ... acteur ... dans ... MAA ... Solar Uniquartier
Co-founder; General director; Partner; Lawyer; Project supervision
M. Mathieu Jobin, directeur général et associé
HEC Montréal; York University
Laurent Messier Chef de la direction et associé
Laurent Messier
Laurent Messier Member of the Board, Chief Executive Officer and Partner, Devimco
Laurent Messier a été nommé chef de la direction de Devimco Immobilier en 2019, puis associé en 2020.
Fort de plus de 20 ans d’expérience dans le domaine financier ... supervise les différentes phases de projets d’envergure
CEO; Partner; CPA; CBV; Finance; 20+ years finance
Laurent Messier Chef de la direction et associé
Université de Sherbrooke
James Goulet Devimco Group
James Goulet
A key member of Groupe Devimco since 2021
After joining the company in 2013 ... leads Devimco’s Residential department ... heads the Acquisitions and Development department
Partner; Acquisitions; Development; Residential; Municipal relations
Associé au sein du Groupe Devimco depuis 2021, James Goulet s’impose comme un leader incontournable du développement immobilier au Québec.
Éric Burns Vice‐Président, Acquisition et développement
Éric Burns
carrière auprès ... comme Ivanhoé Cambridge ... contribué ... Groupe Maurice
nomination ... Éric Burns, au poste de Vice‐Président, Acquisition et développement
Avec plus de 30 ans d’expérience ... Ivanhoé Cambridge ... Groupe Maurice
VP acquisitions; Development; MBA; 30+ years real estate; Ivanhoé Cambridge; Groupe Maurice
Éric Burns Vice‐Président, Acquisition et développement
HEC Montréal
Philippe Bouchard, Vice-président Finances
Philippe Bouchard
nommé Vice-président Finances en 2021
auditeur externe ... joint ... en 2013 ... nommé Vice-président Finances en 2021
VP Finance; CPA; CA; External audit; HEC Montréal
Philippe Bouchard, Vice-président Finances
0 undated completions and 1 boundary-uncertain completions are retained but excluded from figures.
| Project | Location | Type | Units | Floors | Area | Cost | Payment plan | Launched | Construction start | Original target | Handover | Delay | Confidence | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Sir Charles Condominiums | Longueuil, Canada Longueuil new downtown | residential for sale, retail | 3661 | 26 | — | — | — | 2021 | summer 2021 | Jan 2024 – Dec 2024 | May 2025 | +10.5 mo (+5.0 to +16.0) | estimated | completed |
| Lumeo Sud Apartments | Brossard, Canada Solar Uniquartier | residential for rent, retail | 2461 | 10 | — | — | — | 2024 | June 28, 2024 | Jan 2025 – Apr 2025 | Jan 2025 – Dec 2025 | +4.0 mo (−3.0 to +11.0) | sourced | completed |
| Auguste Condominiums – Phase 1 | Montreal, Canada Quartier des lumières | residential for sale, retail | 2651 | 9 and 14 | — | — | — | 2021 | October 13, 2021 | Jun 2023 – Aug 2023 | Sep 2024 | +14.0 mo (+13.0 to +15.0) | estimated | completed |
| Maestria Tour A | Montreal, Canada Quartier des spectacles | residential for sale, residential for rent, retail, mixed use | — | — | — | — | 5% on signing; 5% (post-dated cheque) 6 months after signing the contract; 5%* (post-dated cheque) 12 months after signing the contract1 | 2019 | mid-February 2019 | Jan 2023 – Dec 2023 | Jan 2024 – Dec 2024 | +12.0 mo (+1.0 to +23.0) | sourced | completed |
| Maestria Tour B | Montreal, Canada Quartier des spectacles | residential for sale, residential for rent, retail, mixed use | — | — | — | — | 5% / 5% / 5% (owner occupied); 10% / 5% / 5% (non-owner occupied)1 | 2019 | September 26, 2019 | Jan 2023 – Dec 2023 | Jan 2024 – Dec 2024 | +12.0 mo (+1.0 to +23.0) | sourced | completed |
| Wellington sur le Bassin | Montreal, Canada Griffintown | residential for sale, retail | 3801 | 25 | — | — | Owner occupant: 5% - at contract signature; 5% - 6 months following the contract signature; 5% - 12 months following the contract signature (post-dated check)1 | 2021 | spring 2021 | Jan 2024 – Dec 2024 | Jan 2024 – Dec 2024 | 0.0 mo (−11.0 to +11.0) | sourced | completed |
| Oria Condominiums – Phase 1 | Brossard, Canada Solar Uniquartier | residential for sale | 1581 | 14 | — | — | — | 2021 | 2021 | Jan 2023 – Dec 2023 | May 2023 | −1.5 mo (−7.0 to +4.0) | estimated | completed |
| Nobel au Solar Uniquartier | Brossard, Canada Solar Uniquartier | residential for rent, residential for sale, retail, mixed use | — | — | — | — | — | 2021 | October 2021 | Mar 2022 – May 2022 | Jan 2023 – Dec 2023 | +14.5 mo (+8.0 to +21.0) | sourced | completed |
| MaryRobert | Montreal, Canada District Griffin | residential for sale, retail | 4771 | — | — | — | — | 2018 | spring 2018 | Jan 2021 – Dec 2021 | Jan 2021 – Dec 2021 | dates under review | dates under review | completed |
| Coverage | active |
| Tracked since | October 11, 2026 |
| Last checked | October 12, 2026 this month |
| Profile last researched | October 12, 2026 |
| Claim |