Galliard Homes develops residential and mixed-use schemes across London, southern England, and other UK locations. It builds apartments, townhouses, family homes, hotels, retail and commercial space for first-time buyers, owner-occupiers, investors, renters, institutions, and communities.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
| Project | Overall | Structure & systems | Management & living |
|---|---|---|---|
| Neptune WharfDeptford, London | 9.5/ 10 | 7.9/ 10 HomeViews 4.6/5 · 26 reviews · homeviews.com HomeViews publishes 4.6/5 from 26 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 7.9. | 8.0/ 10 HomeViews 4.7/5, 4.6/5, 4.3/5, 4.7/5, 5/5 · 26 reviews · homeviews.com Combined from 5 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 8. |
HomeViews is the only published building-specific aggregate located and provides the largest available review base: 4.68/5 from 26 resident reviews, converted to approximately 9.0/10. The reviews are strongly positive about management, design and amenities, so commentary adds about 0.5; isolated hot-water, lift, maintenance and amenity-timing comments were not treated as recurring qualifying complaints. | |||
Resident feedback describes the building fabric positively: one review says the apartment is “well insulated” with “quality of kitchen and bathroom appliances” and “good ventilation,” while another calls the design “modern, light filled.” The reported physical drawbacks are limited to occasional hot-water problems resolved within hours, a loose bathroom fitting and insects through a vent; one reviewer also mentioned occasional lifts being out of service and minor wear in shared spaces. No published engineering or formal structural rating was found, so the evidence does not support a separate structural score. | Daily life is reported as comfortable and amenity-rich: residents praise the “state of the art” facilities, cinema and co-working spaces, while management is described as “very responsive” and “always helpful.” The main reservations are that non-urgent matters can take longer, service charges may rise, lifts and shared facilities can be busy, and a resident said the gym and other amenities were still awaiting a clearer opening timeline. | ||
| Papermill HouseRomford115 units | 7.9/ 10 | 7.0/ 10 HomeViews 4.1/5 · 18 reviews · homeviews.com HomeViews publishes 4.1/5 from 18 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 7. | 7.4/ 10 HomeViews 4.5/5, 4.2/5, 4.3/5, 4.2/5, 4.4/5 · 18 reviews · homeviews.com Combined from 5 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.4. |
HomeViews supplies the largest published review base and sets the level at 4.4/5, converted to 8.2/10. Google Reviews/Maps is materially more negative, so the score is pulled down, while the repeated positive themes around location and management partly offset that disagreement; the result is 7.9/10. | |||
The available infrastructure comments are mixed but mostly favourable: one Google reviewer described the building as “well built,” “extremely clean and tidy,” with lifts that “run smooth,” while another called it “well-designed.” The same source includes an isolated allegation of smells and rats, and a HomeViews resident noted that there is only one lift; no repeated structural-failure pattern was established in the material read. | Residents commonly praise the location and management: reviews say the station, shops and hospital are walkable, that management was “prompt and courteous,” and that problems were solved “immediately” or “within days.” Countervailing Google comments include “Stinks,” an allegation of “lots of rats,” and “Wouldn't live there,” while a HomeViews reviewer reported nearby construction and hospital noise. | ||
| TCRW SOHOSoho, London92 units | 7.4/ 10 | —/ 10 | 7.4/ 10 Apple App Store 4.4/5 · 7 reviews · apps.apple.com Apple App Store publishes 4.4/5 from 7 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 7.4. |
The only building-specific aggregate located was the TCRW SOHO resident-app rating of 4.4/5 from seven ratings, below the ten-review anchor threshold; under the supplied rule the score is kept within one point of 6.5, with 6.5 as the converted reference. The one readable resident account was positive and no recurring complaints were found, so the score moves modestly upward to 6.8; there is no published structural rating to score. | Not found in sources: No recurring structural complaint found · No recurring plumbing complaint found · No recurring electrical complaint found · No recurring leak complaint found · No recurring waterproofing complaint found | Not found in sources: No recurring management complaint found · No recurring staff complaint found · No recurring security complaint found · No recurring upkeep complaint found | |
No independent resident review located that reports a structural or systems failure. The available building material describes underfloor heating, comfort cooling, Climaveneta i-NX-Q chillers, Miele appliances and private external space; these are specifications, not resident performance ratings, so the structure score is left unevidenced. | The one published resident account was strongly positive, describing Galliard as “incredibly responsive” and saying the apartment felt “cozy and comfortable”; it also praised the Elizabeth Line convenience and Soho’s restaurants and cafés. The resident acknowledged “a bit of hustle and bustle,” while the resident-app listing describes concierge request tracking and a 24-hour on-site team, but the App Store score is based on only seven ratings and is not a broad building review. | ||
| Enclave: Birmingham CitySouthside, Birmingham628 units | 7.3/ 10 | —/ 10 | 7.3/ 10 |
Google Reviews/Maps is the only platform located that publishes a building-specific aggregate, at 4.1/5 from 13 reviews; converted on the stated curve, that sets the score at approximately 7.3/10. HomeViews lists Enclave: Birmingham City at 0 reviews and no published rating, while the other operational commentary located was for the separate Enclave KX development and was therefore not used for this building’s score. | Not found in sources: Limited evidence on long-term operations | ||
no notes returned no links returned | The visible Google review set is predominantly positive about staff and leasing support: one resident says the staff are “wonderful,” while another says the tenancy process was “smooth and completed in under a week.” The negative evidence is operational and resident-facing: one reviewer reported shouting, music and doors “till 7am” and said “Management ignores every complaint,” while another described multiple tour cancellations; the official site lists a 24/7 on-site team and extensive amenities, but those are advertised provisions rather than resident ratings. | ||
| The StageShoreditch, London412 units | 6.4/ 10 | 6.8/ 10 | 5.8/ 10 |
The building-specific aggregate is published as 3.0/5 from 34 reviews, which converts to 4.0 under the requested market curve and sets the anchor. The review text contains repeated moderate complaints about management, rules and charges, but also repeated praise for concierge staff, facilities and cleanliness; the resulting overall score is 6.4, with living scored separately at 5.8 and structure kept near neutral because structural evidence is sparse. | Not found in sources: No recurring structural failure reported · No published plumbing evidence · No published HVAC evidence · No published electrical evidence · No published leak or waterproofing evidence | ||
The available resident evidence contains no recurring report of structural failure, plumbing, HVAC, electrical, leak or waterproofing problems. One 5/5 review says the apartments are “overall very good, spacious and well lit,” while also noting “some minor design flaws with interiors and fittings”; this is a single written observation, not a published structural sub-score. | Daily-life feedback is sharply mixed but leans negative: residents describe “extremely poor” communication, inflexible rules and difficulty getting things done, including a complaint that management “constantly micromanages.” Countervailing reviews praise “Great staff & concierge,” facilities that are “well cared for & clean,” and a concierge team that makes residents feel “safe and well looked after.” | ||
| Belgrave VillageBirmingham City Centre, Birmingham438 units | 5.9/ 10 | 5.0/ 10 | 5.6/ 10 |
The building-level Google aggregate of 3.6/5 from 10 reviews sets the level, converting to 5.8/10 under the requested curve. The reported reviews contain substantial positive lifestyle feedback but also a severe security complaint and repeated operational concerns, producing a modest net downward adjustment; structure is lower-confidence because the only independent physical criticism concerns sound transmission and there is no published structure sub-rating. | Not found in sources: No published engineering assessment | ||
The published resident material contains limited physical-condition evidence. One reviewer said the “ceiling is thin” and that bedroom walls were thin enough to hear neighbours, while another described the “buildings and apartments” as decent. The developer’s completion report states that houses use air-source heat pumps and apartments use mechanical ventilation, but those are specifications rather than independent resident ratings. | Resident reviews praise the everyday environment as “very tidy,” with “first class facilities and lovely landscaped gardens,” a “good size gym,” and clean hallways. However, operational feedback is sharply mixed: one resident said management “don’t respond and don’t fix issues,” while another called concierge/security “terrible” and reported that locks were not changed after a safety concern. | ||
| Soho WharfLadywood, Birmingham752 units | 5.8/ 10 | 6.0/ 10 | 6.7/ 10 HomeViews 4.1/5, 3.9/5, 4.1/5, 3.7/5, 3.6/5, 4.1/5 · 49 reviews · homeviews.com Combined from 6 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 6.7. |
Google Reviews/Maps has the largest review base and therefore sets the level: 3.5/5 converts to 5.5/10. The score is moderated downward by repeated reports of slow management responses, noise, parking pressure and communal/lift problems, with some offset for repeated praise of the modern design, location, community and helpful staff; the smaller HomeViews aggregate is reported as dissent rather than used as the anchor. | Not found in sources: No mould reported in one review | ||
Physical feedback is mostly positive about the apartments: one review said the ventilation meant there was “no mould” and that the air did not smell bad, while HomeViews residents described the design as modern and facilities as clean and well maintained. The principal system/building concern was a reported lift being “out of service for over a week”; another review said communal areas and the lift were often dirty, so the evidence suggests isolated but meaningful operational-maintenance problems rather than a documented structural defect. | Day-to-day experience is uneven. Residents describe the site as modern, friendly and well located, with “onsite shop, inpost, cafe, bike storage, parcel room and a playground,” but others report that customer care is unresponsive, management “takes time to respond,” and disputed cleaning or redecoration charges created a stressful move-out experience. | ||
| Westgate HouseEaling | 4.9/ 10 | 6.6/ 10 HomeViews 3.9/5 · 17 reviews · homeviews.com HomeViews publishes 3.9/5 from 17 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 6.6. | 6.4/ 10 HomeViews 3.8/5, 3.5/5, 4.4/5, 3.5/5 · 17 reviews · homeviews.com Combined from 4 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 6.4. |
Google Reviews/Maps has the largest reported review base, 31 reviews, so its published 3/5 rating sets the level and converts to 4.0/10 under the supplied curve. HomeViews is materially more positive but has a smaller base; the reported recurring complaints then pull the anchor down, partly offset by repeated praise for amenities and staff. Evidence is current through the stated research date, but the older HomeViews material remains useful mainly as historical resident experience rather than proof that every issue persists today. | |||
Published resident feedback raises recurring building-fabric and systems concerns: “the windows cannot be opened,” ventilation reportedly failed for weeks, and another resident described apartments as having “no soundproofing.” A separate review reports interrupted hot water and parts taking months, while the HomeViews structure-related design score was published as 3.9/5; these are resident observations rather than an engineering inspection. | Residents consistently praise the amenity package—“gym, sauna, steam and cinema rooms”—and some staff, including a review calling Eunice “very knowledgeable ... friendly and cheerful.” Daily-life complaints are substantial: management was described as giving “No response,” one resident said the building was not kept clean, and another reported feeling unsafe after theft and repeated vehicle damage; the latest published aggregate available by the research date was 3.0/5 from 31 reviews. | ||
| Timber Yard, BirminghamSouthside, Birmingham379 units | 4.5/ 10 | —/ 10 | 3.6/ 10 |
Google Reviews/Maps supplies the only published building-specific aggregate located: 3/5 from 27 resident reviews, converting to 4.0 under the requested curve. The written commentary adds recurring management criticism and a severe single water-supply failure, while two reviews praise concierge and apartment finishes; these themes move the evidence-led result to 3.6. The position is based on reviews published through the research date; old project promises and future commitments are not treated as evidence of completed performance. | Not found in sources: No repeated systems evidence | ||
The published reviews include one serious infrastructure complaint: “Water supply shortage started on 15-16 October,” with the reviewer saying management and maintenance did not know how long it would last. A separate review reported “door's sound insulation is very poor,” while another praised “solid fittings” and good appliances; these are individual observations rather than a verified building-wide engineering pattern. The developer’s page describes the scheme as energy-efficient, but that is a project claim, not an independent condition rating. | Daily-life feedback is mixed but the aggregate is weak: one resident said the concierge was “awesome and always available,” and another said the service and concierge were friendly and made them feel safe. Against that, reviews describe reception staff as poor, report unresolved bedbugs and water disruption, and complain that management did not act on antisocial behaviour; the building’s advertised amenities include a gym, club lounge, screening room and concierge. |
Joint venture acquired the Morden Wharf mixed-use development.
Site seller in the Morden Wharf JV acquisition.
Charity involved as a seller in the Morden Wharf JV acquisition.
JV partner on residential-led schemes including Belgrave Village and Barrelmans Point.
JV partner on Belgrave Village and other regeneration projects.
Partner on Grafton Way in Ipswich.
Partner on the Grafton Way Ipswich scheme.
JV partner, contractor and lead sales partner on the Wimbledon scheme.
JV partner City Developments Limited (CDL)
acquired the site from LandsecU+I
Morden College charity
joint venture between leading London developer Galliard Homes and regional landowner-developer Apsley House Capital
joint venture between Wavensmere Homes, Galliard Homes and Apsley House Capital
partners Aviva Investors and Packaged Living
partners Aviva Investors and Packaged Living
JV with Catalyst Housing association
| COMPANY NUMBER | 02158998 Companies House · GB · Active |
| United Kingdom | active 10 projects tracked |
| Residential, for sale | 8 of 10 |
| Retail | 6 of 10 |
| Mixed use | 6 of 10 |
| Residential, for rent | 3 of 10 |
We decided to co-invest into a new joint venture over a three-year period with a view to seeing whether there was anything that could beProperty Week 05 Dec 2014https://www.propertyweek.com/markets/residential/qa-galliard-developments
About us / Stephen Conway
Stephen Conway Non Executive Chairman Galliard Group
the company that was eventually acquired by Frogmore Estates plc, for whom he then worked
05 Dec 2014
Q&A: Galliard Developments
We decided to co-invest into a new joint venture over a three-year period with a view to seeing whether there was anything that could be
Q&A: Galliard Developments
Non-Executive Chairman
In April 2025, after 33 years as Chief Executive, I stepped into the role of Non-Executive Chairman.
A banker by training, Stephen moved his focus to property in the mid-1980s, running his own successful company that was eventually acquired by Frogmore Estates plc, for whom he then worked, until he teamed up with John Black in the early ‘90s to form Galliard Homes. After leading the Group for some 33 years, Stephen stepped down as CEO on 31st March 2025.
until he teamed up with John Black in the early ‘90s to form Galliard Homes
Non-Executive Chairman
Stephen moved his focus to property in the mid-1980s
After leading the Group for some 33 years, Stephen stepped down as CEO on 31st March 2025.
Non-Executive Chairman
For many investors, they’re seeking a real estate agency that can assist with and lead on every aspect of their investment and subsequent property management.The Negotiator 19 Jul 2023https://thenegotiator.co.uk/news/life-residential-in-major-recruitment-drive-as-part-of-scaling-up-strategy-estate-agency/
About us / Richard Conway
Richard Conway Executive Deputy Chairman Galliard Group
He subsequently led LiFE Residential, overseeing its growth and operations.
For many investors, they’re seeking a real estate agency that can assist with and lead on every aspect of their investment and subsequent property management.
Executive Deputy Chairman
Appointed to the Board in 2017, Richard now serves as Deputy Chairman
Richard began his career in the London real estate market before joining Galliard in the mid-1990s. He subsequently led LiFE Residential, overseeing its growth and operations. Appointed to the Board in 2017, Richard now serves as Deputy Chairman
Executive Deputy Chairman
Appointed to the Board in 2017
Executive Deputy Chairman
I have thoroughly enjoyed working with Jonathan over the past nine years and have learnt a lot from him. Galliard Homes is a fantastic business, and I am very excited to step into the role as Investment and Development Director, and working to ensure the future success of the company.Housing Today 13 Jun 2022https://www.housingtoday.co.uk/news/galliard-director-of-investment-moves-to-focus-on-private-lender-ceo-role/5117889.article
About us / Eli Dias
Eli Dias CEO l Galliard Homes
I have thoroughly enjoyed working with Jonathan over the past nine years and have learnt a lot from him. Galliard Homes is a fantastic business, and I am very excited to step into the role as Investment and Development Director, and working to ensure the future success of the company.
Eli was appointed Chief Executive Officer in 2025
Eli was appointed Chief Executive Officer in 2025
Eli was appointed Chief Executive Officer in 2025, having previously served as Investment and Development Director. A first-class graduate in Building Project Management, he joined Galliard in 2012 and has been pivotal in shaping Galliard’s growth, financing, and delivery of major residential and mixed-use developments.
Eli was appointed Chief Executive Officer in 2025
he joined Galliard in 2012
having previously served as Investment and Development Director
Chief Executive
He holds a degree in History from the University of Birmingham and UCLA
He holds a degree in History from the University of Birmingham and UCLA
He holds a degree in History from the University of Birmingham and UCLA
He holds a degree in History from the University of Birmingham and UCLA
and studied law at the College of Law, London.
and studied law at the College of Law, London.
About us / David Hirschfield
David Hirschfield Group Managing Director at Galliard Homes
Beyond Galliard, he is a director of Reflex Property Finance
advises the board of legal AI company Orbital Witness
serves as a trustee for a children’s charity
David trained at Linklaters LLP before moving to Nabarro LLP.
David trained at Linklaters LLP before moving to Nabarro LLP.
was appointed to the Galliard Group Board as Group Managing Director in 2025
was appointed to the Galliard Group Board as Group Managing Director in 2025
David joined Galliard Homes in 2014 as Legal Director and was appointed to the Galliard Group Board as Group Managing Director in 2025. Through his extensive network and experience, he is responsible for securing investment and capital for the Group and overseeing all transactions from a commercial, legal and structural perspective.
was appointed to the Galliard Group Board as Group Managing Director in 2025
A qualified corporate real estate lawyer
David trained at Linklaters LLP before moving to Nabarro LLP.
David trained at Linklaters LLP before moving to Nabarro LLP.
In 2016, he received the ‘Rising Star’ award at the European Counsel Awards for in-house lawyers.
Group Managing Director
having received an LLB in law from Cardiff University
having received an LLB in law from Cardiff University
About us / Amanda Dijk
Amanda Dijk Director & Group FD at Galliard Homes
after nine years as Director of Finance at London City Airport
before taking up a position at The Old Vic Theatre
then appointed to the board in 2025 as Chief Financial Officer
then appointed to the board in 2025 as Chief Financial Officer.
Amanda is a chartered accountant by training, having received an LLB in law from Cardiff University. Amanda joined Galliard in 2016 as Group Financial Controller after nine years as Director of Finance at London City Airport. In 2022, Amanda was promoted to the role of Group Finance Director, overseeing all aspects of the Group’s financial commitments and then appointed to the board in 2025 as Chief Financial Officer.
then appointed to the board in 2025 as Chief Financial Officer
Amanda is a chartered accountant by training
having received an LLB in law from Cardiff University
after nine years as Director of Finance at London City Airport
In 2022, Amanda was promoted to the role of Group Finance Director
Chief Financial Officer
About us / Gary Conway
Gary Conway Chief Operating Officer Loughton, England, United Kingdom (GB)
role of Chief Operating Officer in April 2025
role of Chief Operating Officer in April 2025
Gary has been working within the property sector and beyond for 30 years. A graduate in Law from Leeds University in the mid-1990s, he worked initially in marketing and site acquisition for the Group. During this time he also co-founded and ran a very successful and market-leading insurance services company. After heading up the marketing department for 15 years and having interfaced with all functions of the business since the late 1990’s, Gary was considered well-suited to take up the role of Chief Operating Officer in April 2025. Gary was appointed to the board in 2017.
role of Chief Operating Officer in April 2025
Gary was appointed to the board in 2017.
Gary has been working within the property sector and beyond for 30 years.
he worked initially in marketing and site acquisition for the Group
A graduate in Law from Leeds University in the mid-1990s
Chief Operations Officer
0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.
| Project | Location | Type | Units | Floors | Area | Cost | Payment plan | Launched | Construction start | Original target | Handover | Delay | Confidence | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Enclave: Birmingham City | Birmingham, United Kingdom Southside | residential for rent, retail, mixed use | 6281 | 27, 12 and eight storeys | 557,000 sq ft | — | — | — | — | Jun 2025 – Aug 2025 | Sep 2026 | +14.0 mo (+13.0 to +15.0) | estimated | completed |
| Belgrave Village | Birmingham, United Kingdom Birmingham City Centre | residential for sale, mixed use | 4381 | 11-storeys | — | GBP 112m other | 20% on Exchange / 80% on Completion1 | — | — | Jan 2025 – Dec 2025 | Jun 2025 | −0.5 mo (−6.0 to +5.0) | estimated | completed |
| Neptune Wharf | London, United Kingdom Deptford | residential for sale, residential for rent, retail, mixed use | — | 3 to 12 storeys | 19,000 sq ft | GBP 16m contract value | 10/50/401 | 2021 | 25/10/2021 | — | Mar 2025 | — | not scorable | completed |
| Soho Wharf | Birmingham, United Kingdom Ladywood | residential for rent, retail, mixed use | 7521 | 14 storeys | 10,000 sq ft | GBP 165m other | — | 2021 | 8th March 2021 | — | Nov 2023 | — | not scorable | completed |
| The Stage | London, United Kingdom Shoreditch | residential for sale | 4121 | 37-storey | — | GBP 750m other | 10% on exchange, 90% on completion1 | 2016 | Thursday 17th March | Jan 2019 – Mar 2019 | Nov 2023 | +57.0 mo (+56.0 to +58.0) | estimated | completed |
| TCRW SOHO | London, United Kingdom Soho | residential for sale, retail | 921 | — | 74,675 sq ft | GBP 55m other | 10% deposit / 90% balance1 | 2021 | 2nd September 2021 | Jun 2023 – Aug 2023 | Sep 2022 | more than 9 months early | estimated | completed |
| Orchard Wharf | London, United Kingdom Docklands | residential for sale, retail, mixed use | 3381 | 23 | 288,000 sq ft | — | 4 x 5% payments before completion; 80% at completion1 | 2017 | 24th April 2017 | Apr 2021 – Jun 2021 | Jan 2022 – Dec 2022 | +13.5 mo (+7.0 to +20.0) | sourced | completed |
| Timber Yard, Birmingham | Birmingham, United Kingdom Southside | mixed use, residential for sale, retail | 3791 | Up to 14 storeys | 10,000 sq ft | GBP 4.1m contract value | 15% on exchange, 85% on completion1 | 2019 | October 2019 | Oct 2021 | Jan 2022 – Dec 2022 | +8.5 mo (+3.0 to +14.0) | sourced | completed |
| Papermill House | Romford, United Kingdom | residential for sale | 1151 | — | — | — | — | 2020 | 10th September 2020 | Oct 2020 – Dec 2020 | Jan 2021 – Dec 2021 | +7.5 mo (+1.0 to +14.0) | sourced | completed |
| Westgate House | Ealing, United Kingdom | residential for sale | — | — | — | — | £2,000 reservation fee; 5% on exchange, 5% 6 months after exchange, 5% 12 months after exchange, 5% 18 months after exchange; balance on completion1 | 2017 | 2017 | Jan 2021 – Dec 2021 | Jan 2021 – Dec 2021 | 0.0 mo (−11.0 to +11.0) | sourced | completed |
| Auditor | Buzzacott Audit LLP |
| Coverage | active |
| Tracked since | October 10, 2026 |
| Last checked | October 10, 2026 this month |
| Profile last researched | October 10, 2026 |
| Claim |