Tiger Properties develops residential real-estate projects in the UAE, particularly Dubai and Sharjah, combining off-plan sales with construction delivery. Its homes and investment-oriented developments target owner-occupiers, investors, and businesses seeking contemporary urban housing and long-term property opportunities across the region.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
| Project | Overall | Structure & systems | Management & living |
|---|---|---|---|
| Neva ResidencesJVC District 16, Dubai409 units | 9.7/ 10 | —/ 10 | 9.7/ 10 |
The building-specific Google Reviews/Maps aggregate of 4.9/5 from 10 reviews is the largest qualifying published rating and converts to 9.7/10 under the requested curve. No recurring serious or moderate complaint theme was established, but the evidence is unusually early and includes pre-handover comments, so the score should be read as a review-evidence score rather than a mature resident-tenure assessment. | Not found in sources: No recurring operational complaints | ||
no notes returned no links returned | The building-specific review page reports 4.9/5 from 10 reviews, including “Location is amazing direct access to jvc and near to circle mall” and multiple 5/5 project comments. However, the review record is heavily pre-handover: one November 2025 review said it was “Still under construction,” while Tiger’s publication states that handover occurred on March 16, 2026; therefore current day-to-day management and amenity performance remain only lightly evidenced as of October 7, 2026. | ||
| Nobles TowerBusiness Bay, Dubai549 units | 9.1/ 10 | —/ 10 | 9.1/ 10 |
The 4.7/5 Google aggregate over 186 reviews is the only published building-specific rating located and therefore sets the level at 9.1/10 under the stated conversion curve. The visible written commentary is mostly positive but concerns Business Bay generally rather than tower operations; its minor traffic and community complaints do not warrant a score adjustment. | |||
no notes returned no links returned | The published comments emphasize a convenient, central lifestyle: one reviewer calls Business Bay “one of the most central and vibrant locations of Dubai,” while another highlights the canal for evening walks and nearby restaurants. The same comments repeatedly mention peak-hour traffic, a crowded metro and the area’s weaker community feel; no reviewer feedback specifically evaluates Nobles Tower’s management, staff, security or upkeep. | ||
| Cloud TowersJumeirah Village Triangle, District 2, Dubai456 units | 8.3/ 10 | 5.6/ 10 Airbnb 3.5/5 · 4 reviews · airbnb.com Airbnb publishes 3.5/5 from 4 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 5.6. | 5.9/ 10 Airbnb 3.5/5, 4/5 · 4 reviews · airbnb.com Combined from 2 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 5.9. |
The Google building aggregate of 4.8/5 from 100 reviews is the largest published review base and converts to 9.0/10 under the required curve. The score is reduced for the reported construction/readiness issue and modestly restored for repeated praise of facilities and handover staff; the result is 8.0/10. Structural scoring remains null because the reviewed material does not publish evidence about framework, plumbing, HVAC, electrical systems or leaks. | Not found in sources: Limited resident-year evidence | ||
no notes returned no links returned | Published building reviews praise the facilities—one reviewer wrote, “Great facilities in a very new tower”—and several praised handover staff as “professional” and “friendly.” The principal operational reservation is that the building was “not fully ready yet,” with “lots of works going on” and amenities “not ready to be used properly”; the short-stay listing separately reports 3.5/5 for cleanliness and value. | ||
| Lilium TowerJumeirah Village Triangle, Dubai263 units | 8.0/ 10 | 5.6/ 10 Property Finder 3/5 · no review count · propertyfinder.ae Property Finder publishes 3/5 with no review count. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 5.6. | 7.4/ 10 Property Finder 4/5, 5/5, 5/5 · no review count · propertyfinder.ae Combined from 3 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.4. |
Property Finder’s 4.2/5 aggregate is the resident-oriented anchor among the available building pages, but it has only three reviews, so the result is kept within one point of the prescribed 6.5 low-evidence level. Google Reviews/Maps shows a higher 5.0/5 from the same-sized three-review base, while the only delivery concern is a single dated comment and does not qualify as a recurring or severe failure. | Not found in sources: No structural failure reported · No lift failure reported · No plumbing failure reported · No HVAC failure reported · No detailed engineering comments · No infrastructure review detail · No leak reports published · No electrical-system review detail | Not found in sources: No detailed management feedback · No detailed security feedback · No detailed common-area feedback | |
Property Finder publishes a 3/5 Maintenance sub-score on the Lilium Tower page, but the written comments do not describe a specific defect, leak, plumbing, HVAC, electrical or lift problem. The available Google-linked review is about hoped-for delivery timing—“I hope they will deliver the units without delay”—rather than completed building-condition performance; therefore structural conclusions remain limited and partly unevidenced. | Property Finder’s comments describe JVT as “peaceful and green,” with “great schools and parks,” and its displayed category scores include 5/5 for Peace & Quiet, 4/5 for Connectivity & Traffic, and 5/5 for Amenities. The Google-linked review was positive but still expressed a future commitment concern: “I hope they will deliver the units without delay”; this is a dated 2025 comment, not proof of a current 2026 operational problem. | ||
| The V TowerWadi Al Safa 5, Dubai369 units | 7.5/ 10 | —/ 10 | —/ 10 |
Google Reviews/Maps is the only published building-specific rating located and reports 4.3/5 from 142 reviews, which converts to 7.0/10 under the specified curve. No individual review texts, aspect scores, or recurring themes were available in the pages read, so no commentary adjustment is applied; structure and living subscores remain unevidenced. | Not found in sources: No published structural praise · No published plumbing praise · No published HVAC praise · No published electrical praise · No published waterproofing praise · No published structural complaints · No published plumbing complaints · No published HVAC complaints · No published electrical complaints · No published waterproofing complaints | Not found in sources: No published staff praise · No published security praise · No published amenity praise · No published upkeep praise · No published management complaint · No published security complaint · No published amenity complaint · No published upkeep complaint | |
No building-specific raw infrastructure feedback or structural sub-scores were published in the pages read. Accordingly, no structural condition is inferred from the absence of such evidence. no links returned | The available building page reports a Google rating of 4.3/5 from 142 reviews, but does not reproduce individual operational comments or category scores. Property Finder says “Be the first to review The V Tower,” so no resident prose was available there for staff, management, security, amenities or upkeep. | ||
| Regina TowerJumeirah Village Circle (JVC) District 12, Dubai308 units | 7.2/ 10 | 4.9/ 10 Property Finder 1.5/5 · 3 reviews · propertyfinder.ae Property Finder publishes 1.5/5 from 3 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 4.9. | 5.2/ 10 Property Finder 2.5/5, 2.1/5, 1.9/5, 3/5, 1.8/5 · 3 reviews · propertyfinder.ae Combined from 5 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 5.2. |
Google Reviews/Maps sets the level with the largest published review base: 4.1/5 from 237 reviews, converted to 7.4/10. Recurring complaints about maintenance, chemical smell and noise lower that anchor, while repeated praise for management and amenities offsets part of the reduction; the limited three-review Property Finder set is recorded but not scored. | |||
Structural evidence is mixed and largely resident-reported rather than engineering-tested. Property Finder records “countless maintenance issue[s],” says “All the broken things had never being fully fixed,” and reports “water leakage time to time”; a Google reviewer separately requested gym-machine servicing and pest control, while another praised repairs involving “plumbing, AC, or general repairs.” | Day-to-day reports range from very positive to sharply negative. Google reviewers describe facilities as “top-notch and always spotless,” call management “incredibly helpful and responsive,” and say issues were resolved “quickly and professionally”; in contrast, Property Finder reviewers report the “worse building management,” construction noise, chemical smell and poor isolation, with the page publishing a 2.2/5 building rating from three reviews. | ||
| Altai TowerJumeirah Village Triangle, District 1, Dubai244 units | 7.0/ 10 | —/ 10 | 7.0/ 10 |
No applicable platform publishes a qualifying aggregate rating for Altai Tower, so the score is based on the three written entries actually read. All three are positive, but they primarily describe JVT rather than verified building operations or physical performance; therefore the prose-only ceiling and small-evidence pull toward 6.5 produce 7.0. The expected April 2026 completion date reported by Bayut is a future commitment/forecast in that source, not evidence of actual completion as of 2026-10-07. | Not found in sources: No building-level management feedback · No resident staff feedback · No building-level security feedback · No building-level upkeep feedback · Limited review base | ||
no notes returned no links returned | The published written material is positive about the wider JVT lifestyle rather than Altai Tower’s day-to-day operations: reviewers describe the area as “tranquil, peaceful and green,” and one calls it “A quiet escape from the city and construction.” Another review highlights proximity to key places, while the available entries do not provide building-specific staff, management, security or amenity ratings. | ||
| The Square TowerJumeirah Village Circle, Dubai370 units | 7.0/ 10 | 5.8/ 10 | 6.1/ 10 |
Google Reviews/Maps provides the eligible anchor at 4.1/5 from 145 reviews, converting to 7.4/10 under the supplied curve. Repeated reports of unresponsive management, maintenance delays, leaks, drainage and pool/upkeep problems materially lower resident confidence, while repeated praise for security and facilities prevents a lower result. The evidence is review-based and current excerpts extend into 2026, but the platform snapshots and individual review dates should not be treated as a single same-day survey. | |||
Published review excerpts raise concrete systems concerns: one resident reported AC unresolved for about four months, another described recurrent water leaking from tanks that damaged furniture, walls and paint, and another reported drainage that was “always blocked.” A separate review called the building “cheaply built with bad fixtures,” while the building page records a 4.2/5 overall rating from one review but does not publish a structural sub-score. | The positive side of the resident feedback emphasizes facilities and security: one reviewer called the security and facilities “amazing,” while others described the pool and gym positively and called security friendly and efficient. The negative operational pattern is management responsiveness and money/deposit handling—one resident said repeated emails about a chiller deposit received no response—and other excerpts complain that the pool turned green, bins overflowed and management ignored maintenance requests. | ||
| Seslia TowerJumeirah Village Triangle, Dubai360 units | 5.5/ 10 | —/ 10 | —/ 10 |
The only published aggregate located was Property Finder's 4.2/5 community rating based on 3 reviews, and the scoring rules prohibit using a rating under 10 reviews as the anchor. The written reviews were about JVT/community conditions rather than the tower itself, so no building resident score is supportable. | |||
no notes returned no links returned | The available Property Finder material is explicitly a JVT/community review set rather than verified resident feedback about tower operations. Reviewers described the area as “peaceful and green,” with “great schools and parks,” while one referred to escaping “the city and construction”; no tower-specific management, security, staff, cleanliness or amenity complaints were published in the material read. |
Sharjah Office Sharjah, Al-Taawun Area Tiger 2 Bld , 3 rd Floor
Saudi Arabia King Abdulaziz Road Riyadh, Saudi Arabia
Jordan - Amman Building a boulevard opposite Alia Central Restaurant
It served as general contractor and MEP contractor for The Trio 2 Tower in Residential Dubai.
Tiger International General Contracting Company
Role(s): General Contractor, MEP Contractor
Role(s): General Contractor, MEP Contractor
| COMPANY NUMBER | 562946 Dep. of Economic Development · United Arab Emirates · Active |
| United Arab Emirates | active 10 projects tracked |
| Residential, for sale | 7 of 10 |
| Mixed use | 5 of 10 |
| Retail | 1 of 10 |
We are committed to maintain TIGER GROUP as the “Pioneer Developer of choice” in the United Arab Emirates and in the Region.Tiger Group https://www.tigergroup.ae/about-us
Founder Eng.Waleed Mohammad AlZoubi Chairman Eng.Waleed Mohammad AlZoubi
We are committed to maintain TIGER GROUP as the “Pioneer Developer of choice” in the United Arab Emirates and in the Region
Waleed Mohammad Al Zaabi, Founder And Chairman Of Tiger Holding
Al Zaabi founded Tiger Group in 1976 as a construction firm
A civil engineer by training, Al Zaabi founded Tiger Group in 1976 as a construction firm and then moved into real estate development in 1996.
Chairman Eng. Waleed Mohammad Al Zaabi
Amer Waleed Al Zoubi, CEO of Tiger Properties
# Amer Waleed Al-Zaabi
Chief Executive Officer - Tiger Group (Current) Jan 2016 - Present
Chief Executive Officer - Tiger Group (Current) Jan 2016 - Present
Although a family business, the young Sharjah University graduate took the role of a project engineer when first joining Tiger Group. From there, he quickly climbed the ranks, becoming an operation manager for Tiger Properties in the span of a year.
Amer Waleed Al Zoubi, CEO of Tiger Properties
# ABDULMONAEM ALSMADI
# ABDULMONAEM ALSMADI
Department: General Management • Level: Director
Jan 2007 - Present (19 years and 8 months)
Lead Government and Public Relations Department, setting goals and objectives, building and motivate team for continual improvement Develop Government and Public Relations Department Budget, Expenditures and cash Flow Develop Government and Public Relations Department Strategy to achieve Department and Company’s goals and objectives Coordinate with manpower Supply agents
### Director of Public and Government Relations - Tiger Group (Current)
# Zoya Libzo
# Zoya Libzo
Department: Human Resources • Level: Director
Oct 2023 - Present (2 years and 11 months) in Dubai, Dubai, United Arab Emirates
Workforce planning, succession planning, talent management, total rewards, coaching leaders and managers and improve the workplace are some of my key focus areas.
### Human Resources Director - Tiger Properties (Current)
# Basem Nassar
# Basem Nassar
Level: Director
Vice President of Sales (Current) Feb 2024 - Present HEAD OF AGENT DEPARTMENT (Current) Sep 2021 - Present
Leading strategic initiatives for the group; Leading projects to maximize revenues and distribution channels; Improving services and processes across the different departments; Market entry strategy and execution
#### Vice President of Sales (Current) ... #### HEAD OF AGENT DEPARTMENT (Current)
# Ahmad Khabier
# Ahmad Khabier
Department: Sales • Level: Director
Feb 2022 - Present (4 years and 7 months)
Success Coach & Sales Manager @Tiger Group, I lead my team to assist Real Estate Brokers to close deals & avoid rejection by offering great value to them & their clients.
### Sales Director - Tiger Group (Current)
0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.
| Project | Location | Type | Units | Floors | Area | Cost | Payment plan | Launched | Construction start | Original target | Handover | Delay | Confidence | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lilium Tower | Dubai, United Arab Emirates Jumeirah Village Triangle | residential for sale | 2631 | 28 storeys | — | AED 250m investment announced | 64:36 (Post Handvoer)1 | 2023 | September 11, 2023 | Dec 2025 | Oct 2026 | +10.0 mo (+10.0 to +10.0) | sourced | completed |
| Altai Tower | Dubai, United Arab Emirates Jumeirah Village Triangle, District 1 | residential for sale | 2441 | 26 | — | — | 10% / 10% / 60% / 20%1 | 2023 | 06-Jun-2023 | Jan 2024 – Dec 2024 | Sep 2026 | +26.5 mo (+21.0 to +32.0) | estimated | completed |
| Seslia Tower | Dubai, United Arab Emirates Jumeirah Village Triangle | mixed use | 3601 | 36 floors | 22,267 m² | — | 20/40/10/301 | 2022 | 01-Dec-2022 | Dec 2025 | Sep 2026 | +9.0 mo (+9.0 to +9.0) | estimated | completed |
| Neva Residences | Dubai, United Arab Emirates JVC District 16 | mixed use | 4091 | G+4P+17F+R | — | — | 70/301 | 2023 | January 2023 | Oct 2025 – Dec 2025 | Mar 2026 | +4.0 mo (+3.0 to +5.0) | sourced | completed |
| Cloud Towers | Dubai, United Arab Emirates Jumeirah Village Triangle, District 2 | residential for sale, mixed use | 4561 | 29 storeys | — | AED 400m investment announced | 20/40/20/201 | 2022 | March 1, 2022 | — | Oct 2025 | — | not scorable | completed |
| Nobles Tower | Dubai, United Arab Emirates Business Bay | residential for sale, retail | 5491 | 46-storey | — | — | 50/50 Post Handover1 | 2021 | February 28, 2021 | Dec 2023 | Oct 2024 | +10.0 mo (+10.0 to +10.0) | sourced | completed |
| The V Tower | Dubai, United Arab Emirates Wadi Al Safa 5 | residential for sale | 3691 | 18 storeys (+3 basement levels) | — | AED 110.5m estimated cost | 50/501 | — | — | Aug 2023 | Sep 2023 | +1.0 mo (+1.0 to +1.0) | sourced | completed |
| Blue Waves Tower | Dubai, United Arab Emirates Dubai Land Residence Complex | residential for sale, mixed use | 5581 | 24 storeys (+3 basement levels) | 1,000,000 sq ft | AED 500m investment announced | 50/501 | 2019 | 22 September 2019 | Jan 2022 – Apr 2022 | Jan 2023 | +10.5 mo (+9.0 to +12.0) | sourced | completed |
| Regina Tower | Dubai, United Arab Emirates Jumeirah Village Circle (JVC) District 12 | residential for sale | 3081 | 37 storeys (+2 basement levels) | — | AED 103.6m other | 50:501 | 2019 | 24 January 2019 | Dec 2021 | May 2022 | +5.0 mo (+5.0 to +5.0) | sourced | completed |
| The Square Tower | Dubai, United Arab Emirates Jumeirah Village Circle | mixed use | 3701 | 42 storeys (2 basement levels, a ground floor, 4 podium levels and 37 floors) | — | — | 20/801 | 2017 | 2017 | Oct 2020 – Dec 2020 | Jul 2021 | +8.0 mo (+7.0 to +9.0) | sourced | completed |
| Coverage | active |
| Tracked since | October 6, 2026 |
| Last checked | October 7, 2026 this month |
| Profile last researched | October 7, 2026 |
| Claim |